My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-04-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-04-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2017 1:20:45 PM
Creation date
4/24/2014 5:32:03 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
4/28/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.B. - Page 17 <br /> expedited notification protocol which must be carried out just prior to conducting an included activity, as <br /> well as post-activity accounting and periodic reporting, to evaluate the impacts and efficacy of the <br /> program over the long term.And finally, mitigation to offset impacts associated with routine maintenance <br /> activities is often evaluated upfront and from a cumulative perspective, and is typically assessed as a <br /> one-time event. <br /> The Consultant shall deliver a Lagoon Maintenance Program report which includes revised versions of <br /> the technical memoranda delivered for Tasks 1-3. In addition, the proposed modifications shall be <br /> assessed at a conceptual level of design for costs and permitting. <br /> TIME SCHEDULE <br /> Contract Execution e* <br /> 1.Project Sala Collector)and Review <br /> Data,Report,and Sile Reviee+ <br /> Project Definition Refinereont <br /> Field Survey and lagoon Observations <br /> 2.Perform Simulation of Existing Conditions <br /> Model Setup,Calibration,and Validation <br /> Virtual Tracer Assessment <br /> 3.Perform Simulations of Proposed Lagoon MedilicatIans <br /> Develop Proposed Mudd atone <br /> Configure and Execute Simafatinns <br /> Simulation Analysis and Interpretalion <br /> 4.Prepare Preliminary Fngtoeiring Report +h <br /> 5.Prepare Lagoon Maintenance Program <br /> iaa Cyr irr Frc rnl C!:•lrlI-? <br /> Work shall be completed per the following schedule: <br /> Project data collection and review Two(2)months from NTP <br /> Perform simulation of existing conditions Within third month from NTP <br /> Perform simulations of proposed lagoon modifications Within fifth month from NTP <br /> Prepare preliminary engineering report Five(5) months from NTP <br /> Prepare lagoon maintenance program Six(6)months from NTP <br /> REV:04-09-14 VR <br /> Page 15 of 16 <br /> ATTY/AG R.2 014.04 8/E S A_88464 <br />
The URL can be used to link to this page
Your browser does not support the video tag.