Laserfiche WebLink
7.1.B. - Page 17 <br /> expedited notification protocol which must be carried out just prior to conducting an included activity, as <br /> well as post-activity accounting and periodic reporting, to evaluate the impacts and efficacy of the <br /> program over the long term.And finally, mitigation to offset impacts associated with routine maintenance <br /> activities is often evaluated upfront and from a cumulative perspective, and is typically assessed as a <br /> one-time event. <br /> The Consultant shall deliver a Lagoon Maintenance Program report which includes revised versions of <br /> the technical memoranda delivered for Tasks 1-3. In addition, the proposed modifications shall be <br /> assessed at a conceptual level of design for costs and permitting. <br /> TIME SCHEDULE <br /> Contract Execution e* <br /> 1.Project Sala Collector)and Review <br /> Data,Report,and Sile Reviee+ <br /> Project Definition Refinereont <br /> Field Survey and lagoon Observations <br /> 2.Perform Simulation of Existing Conditions <br /> Model Setup,Calibration,and Validation <br /> Virtual Tracer Assessment <br /> 3.Perform Simulations of Proposed Lagoon MedilicatIans <br /> Develop Proposed Mudd atone <br /> Configure and Execute Simafatinns <br /> Simulation Analysis and Interpretalion <br /> 4.Prepare Preliminary Fngtoeiring Report +h <br /> 5.Prepare Lagoon Maintenance Program <br /> iaa Cyr irr Frc rnl C!:•lrlI-? <br /> Work shall be completed per the following schedule: <br /> Project data collection and review Two(2)months from NTP <br /> Perform simulation of existing conditions Within third month from NTP <br /> Perform simulations of proposed lagoon modifications Within fifth month from NTP <br /> Prepare preliminary engineering report Five(5) months from NTP <br /> Prepare lagoon maintenance program Six(6)months from NTP <br /> REV:04-09-14 VR <br /> Page 15 of 16 <br /> ATTY/AG R.2 014.04 8/E S A_88464 <br />