My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2014-032830
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2014-032830
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2014 1:46:59 PM
Creation date
5/6/2014 1:46:57 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Stormwater Treatment Measures Maintenance Agmt
Doc Num
2014-032830
Rec Date
4/18/2014
APN
052-383-250
Address
333 Main St.
Parties
333 Main Street RWC, LLC
MO Ref
14-058
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�_.+ _ <br /> • Thorough inspection and maintenance visits in late summer or early fall prior to the rainy <br /> season. <br /> • Monitoring at least twice during the wet season (typically December and March). <br /> • Monitoring BMP's following flood events. <br /> Observations and recommendations for corrective measure (if necessary)will be recorded and <br /> kept by the property owner, their Facilities Department, or property manager. They will also be <br /> responsible for the monitoring and maintenance of data collected, which will need to be kept on- <br /> site and made available to the City of Redwood City staff for inspection. Remedial maintenance <br /> will be performed immediately or scheduled to take place within a reasonable time frame. <br /> Name of Responsible Party for self-i�spections: <br /> Address: <br /> Phone: Fax: E-mail: <br /> Description of Items for Self-Inspection <br /> (e.g. BMP, non storm discharges,soil erosion,and others applicable to site) Self-Inspection Schedule <br /> Inlets, Catch Basins, Drains, Planters Following Storm Events <br /> Media Filter Following Storm Events <br /> Flow Monitoring March&December <br /> 6.4 Emptoyee Training Program <br /> Employees shall be trained to implement post-construction operations and maintenance of all <br /> storm water BMP's at the project site. <br /> • A copy of the SWMP will be made available to personnel in charge offacility <br /> maintenance and will be distributed to the subcontractor representative engaged in the <br /> maintenance or installation of the BMP's. <br /> • Training sessions will be included as a part of Facilities Department meetings to <br /> familiarize members with the SWMP. <br /> • A copy of the yearly inspection reports shall be managed by the Facilities Department. <br /> Name of Responsible Party for training: <br /> Address: <br /> Phone: Fax: E-mail: <br /> Description of Items for Training Employees To Be Trained <br /> Training Schedule <br /> (e.g.maintenance, inspection, pesticide use) (Job Category or Title) <br /> Maintenance Inspection Yearly Facilities Departrnent Members <br /> Pesticide Use Yearly Facilities Departrnent Members <br /> 15 <br /> BKFJob No.20070073 <br /> K:\MAIN\2007�070073\06 Design\C Storm Drain System\SWMP\2011-11-04\333_MAIN_SWMP.doc <br /> ATTY/AGR.2014.028/333 Main Street Stormwater Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.