My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Bayside Stripe & Seal, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Under 60K
>
Agmt14 Bayside Stripe & Seal, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2014 3:08:29 PM
Creation date
5/6/2014 3:08:21 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Bayside Stripe & Seal, Inc.
PROJECT NAME
Brewster Avenue Bicycle Improvements- Signing and striping project
RMP File Number
304.5
Date
5/5/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. � �.. .. �_,� �._.� �.� �.w 4,�. �,�� <br /> 1.04 ALLOWABLE DISCHARGES <br /> A. Under current NPDES regulations, the following discharges to the storm drainage <br /> system are permitted, as long as the discharges are not significant pollutants: <br /> 1. Diverted stream flows, springs and natural drainage courses; <br /> 2. Rising flood waters; <br /> 3. Air conditioning condensation; <br /> 4. Domestic water line and hydrant flushing; and <br /> 5. Landscape irrigation. <br /> B. Groundwater from dewatering and foundation drains will need additional <br /> certification that the groundwater has been tested or evaluated for the presence of <br /> pollutants subject to non-stormwater discharge regulations. In such a case, a <br /> Special Sewer Discharge Permit shall be required for the water to be discharged to <br /> the Sanitary Sewer System, as directed. <br /> PART2 - PRODUCTS <br /> NONE <br /> PART 3— EXECUTION <br /> 3.01 RECYCLING <br /> A. At the end of each working day, all scrap, debris and waste material shall be <br /> collected and materials disposed of properly. <br /> B. Dry, empty paint cans/buckets, old brushes, rollers, rags and drop cloths shall be <br /> disposed of in approved waste collection. <br /> C. Dumpsters shall be inspected for leaks. As leaks are detected, the trash hauling <br /> contractor shall be contacted to replace of repair dumpsters that leak. <br /> D. Water from cleaning dumpsters shall not be discharged on-site. <br /> E. Regularwaste collection shall be arranged for before dumpsters overflow. <br /> 3.02 HAZARDOUS MATERIAUWASTE MANAGEMENT/MATERIALS <br /> MANAGEMENT <br /> A. Designated areas of the project site shall be proposed by the contractor for <br /> approval by the Engineer suitable for material delivery, storage and waste <br /> collection as far from catch basins, gutters, drainage courses and creeks as <br /> possible. <br /> STORMWATER POLLUTION PREVENTION 02133-2 <br /> BREWSTER AVENUE BICYCLE IMPROVEMENTS-SIGNING AND STRIPING PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.