Laserfiche WebLink
7.1.C. - Page 14 <br /> this Agreement to determine that the Work is in keeping with the Artist representations; <br /> and <br /> C. Review of design and installation method within 30 days prior to the commencement <br /> of installation; and <br /> D. Periodic on-site inspections as Work progresses; and <br /> E. Final inspection and acceptance after installation. <br /> The reviews shall occur within two weeks of the Artist's written notice to the City of readiness for <br /> the review. <br /> If the Work does not conform to the proposal as described in Exhibit A attached hereto or as <br /> mutually agreed by the parties, notice of specific non-conformity and request for the Artist to <br /> address the specific non-conformity shall be given to Artist in writing within two weeks after the <br /> review period. Artist shall have thirty days to address and correct any non- conformity. If, after <br /> resubmission, the Work still does not conform, the City retains the right to immediately <br /> terminate the agreement and remove the non-conforming work product. <br /> 6. Project Close-out. <br /> Upon completion and installation of the Work, the Artist will furnish the City with a full Release <br /> and Waiver of Lien, plus releases from any major supplier or subcontractor involved with the <br /> Work. The Artist shall also submit a maintenance report to City including specific <br /> recommendations for ongoing maintenance and possible repairs as well as photo/video and <br /> written documentation off fabrication and installation of the Work, such <br /> as to assist in maintenance and/or repair, if so requested by the City. <br /> 7. Repairs, Maintenance,or Alterations. <br /> A. The Artist is responsible for all parts and workmanship for a period of one year after <br /> acceptance of the Work by the City and will replace any defective parts or rework any <br /> defective craftsmanship in a timely fashion at no cost except as provided hereafter in <br /> sections 7B and 7C. <br /> B. The Artist is not responsible for and will not be held liable for any damage to the Work, <br /> its surfaces, or environment caused by personnel of the City or by contracted <br /> employees,visitors, or others, beyond the control of, the Artist. <br /> C. The Artist is not responsible for and will not be held liable for any damages to the • <br /> Work by weather conditions, acts of God, or other acts abnormal to the site. <br /> 8. Subletting or Assignment of Work. <br /> The Artist will not sublet or assign any of her obligations under this contract that require her <br /> artistic talents.Artist may sublet or assign obligations that do not require her artistic <br /> talents, including, but not limited to, such obligations as transport of the Work and installation. <br /> ATTY/AGR/SIRE/AGR/TEMPLATE/ARTIST AGREEMENT (UTILITY BOX MURAL) <br /> REV: 05-02-14 MLG <br /> Page 7 of 7 <br />