Laserfiche WebLink
7.1.F. - Page 55 <br /> 525 Middlefield Rd <br /> V. Summary of Inspections and Maintenance: <br /> Summarize the following information using the attached Inspection and Maintenance <br /> Checklists: <br /> Identifying Date of Operation and Maintenance Activiti es Additional Comments <br /> Number of Inspection Performed and Date(s)Conducted <br /> Treatment <br /> Measure <br /> VI. Sediment Removal: <br /> Total amount of accumulated sediment removed from the stormwater treatment <br /> measure(s)during the reporting period: cubic yards. <br /> Flow was sediment disposed? <br /> ❑ landfill <br /> ❑ other location on-site as described in and allowed by the maintenance <br /> plan <br /> ❑ other,explain <br /> Page 2 O&M Inspection Report <br /> REV:03-21-14 VR <br /> Page 15 of 16 <br /> ATTYIAGR.2014.039/Indigo 525 Middlefield - Stormwater Agreement <br />