Laserfiche WebLink
7.1.G. - Page 42 <br /> The property contains permeable paver areas located within portions of Lots 1 through 5 and as shown <br /> in the attached site plan. <br /> V. Routine Maintenance Activities for Permeable Paver Areas <br /> The principal maintenance objective is to prevent sediment buildup and clogging, which reduces <br /> pollutant removal efficiency and may lead to permeable paver area failure. Routine maintenance <br /> activities, and the frequency at which they will be conducted, are shown in Table 2. <br /> Table 2 <br /> Routine Maintenance Activities for Permeable Paver Areas <br /> No. Maintenance Task Frequency of Task <br /> 1 Keep landscaped areas well maintained. Monthly,or as needed after storm <br /> events <br /> 2 Inspect the surface of the permeable pavers and vacuum End of Winter(April) <br /> clean using commercially available sweeping machines, Mid-summer(July/August) <br /> After autumn leaf fall(November) <br /> 3 Inspect outlets.Remove trash and debris. Before wet season begins,or as <br /> needed <br /> 4 When vacuum cleaning is conducted,inspect pavers for During vacuum cleaning <br /> any signs of hydraulic failure. <br /> 5 Inspect permeable paver areas using the attached Monthly,or after large storm events, <br /> inspection checklist. and after removal of accumulated <br /> debris or material <br /> VI. Permeable Paver Area Inspections <br /> The attached Permeable Paver Area Inspection and Maintenance Checklist shall be used to conduct <br /> inspections monthly (or as needed), identify needed maintenance, and record maintenance that is <br /> conducted. <br /> REV: 04-10-14 VR <br /> Page 15 of 15 <br /> ATTY/AGR.2014.051/VALOTA DEVELOPMENT_1410 Valota_STMMA <br />