My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-05-12 Joint with Planning
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-05-12 Joint with Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2014 10:20:56 AM
Creation date
5/8/2014 4:38:52 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
5/12/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
519
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.G. - Page 58 <br /> MITIGATION MONITORING OR REPORTING PROGRAM <br /> 1410 VALOTA ROAD RESIDENTIAL PROJECT <br /> Responsibility <br /> Impact Mitigation Timeframe for fog, Oversight of <br /> Implementation Implementation Implementation <br /> AIR QUALITY <br /> Impact AIR-1: •All exposed surfaces(e.g.,parking areas,staging areas,soil piles, During all phases of Project applicant Community <br /> Construction- graded areas,and unpaved access roads)shall be watered two demolition, and contractors. Development Director <br /> generated dust would times per day. grading,and <br /> result in a short-term •All haul trucks transporting soil,sand,or other loose material off- construction. <br /> significant air quality site shall be covered. <br /> impact.Significant •All visible mud or dirt tracked onto adjacent public roads shall be <br /> Impact. removed using wet power vacuum street sweepers at least once <br /> per day.The use of dry power sweeping is prohibited. <br /> •All vehicle speeds on unpaved roads shall be limited to 15 mph. <br /> a All roadways,driveways,and sidewalks to be paved shall be <br /> completed as soon as possible. Building pads shall be laid as soon <br /> as possible alter grading unless seeding or soil binders are used. <br /> •Idling times shall be minimized either by shutting equipment off <br /> when not in use or reducing the maximum idling time to 5 minutes <br /> (as required by the California airborne toxics control measure Title <br /> 13,Section 2485 of California Code of Regulations[CCR]).Clear <br /> signage shall be provided for construction workers at all access <br /> points. <br /> •All construction equipment shall be maintained and properly tuned <br /> in accordance with manufacturer's specifications.All equipment <br /> shall be checked by a certified mechanic and determined to be <br /> running in proper condition prior to operation. <br /> •Conspicuously post a telephone number and person to contact at <br /> the Lead Agency regarding dust complaints. This person shall <br /> respond and take corrective action within 48 hours. The Air <br /> 1410 Valota Road Residential Project February 2012 <br /> Mitigation Monitoring or Reporting Program page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.