My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-05-12 Joint with Planning
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-05-12 Joint with Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2014 10:20:56 AM
Creation date
5/8/2014 4:38:52 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
5/12/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
519
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit C 7.1.H. - Page 24 <br /> Bioretention Area Maintenance Plan Date of Inspection: <br /> Property Address: 1300 Maple St. Redwood City, CA 94063 Treatment Measure Noy <br /> Table 1 <br /> Routine Maintenance Activities for Bioretention Areas <br /> No. Maintenance Task Frequency of Task <br /> 1 Remove obstructions, debris and trash from bioretention Monthly, or as needed after storm <br /> area and dispose of properly. events <br /> 2 Inspect bioretention area to ensure that it drains between Monthly, or as needed after storm <br /> storms and within five days after rainfall. events <br /> 3 Inspect inlets for channels,soil exposure or other Monthly, or as needed after storm <br /> evidence of erosion. Clear obstructions and remove events <br /> sediment. <br /> 4 Remove and replace all dead and diseased vegetation. Twice a year <br /> 5 Maintain vegetation and the irrigation system. Prune and Before wet season begins, or as <br /> weed to keep bioretention area neat and orderly in needed <br /> appearance. <br /> 6 Check that mulch is at appropriate depth (3 inches per soil Monthly <br /> specifications)and replenish as necessary before wet <br /> season begins. <br /> 7 inspect bioretention area using the attached inspection Monthly, or after large storm events, <br /> checklist. and after removal of accumulated <br /> debris or material <br /> IL Prohibitions <br /> The use of pesticides and quick release fertilizers shall be minimized, and the principles of <br /> integrated pest management (IPM) followed: <br /> 1. Employ non-chemical controls (biological, physical and cultural controls) before using <br /> chemicals to treat a pest problem. <br /> 2. Prune plants properly and at the appropriate time of year. <br /> 3. Provide adequate irrigation for landscape plants. Do not over water, <br /> 4. Limit fertilizer use unless soil testing indicates a deficiency. Slow-release or organic <br /> fertilizer is preferable. Check with municipality for specific requirements. <br /> 5. Pest control should avoid harming non-target organisms, or negatively affecting air and <br /> water quality and public health. Apply chemical controls only when monitoring indicates <br /> that preventative and non-chemical methods are not keeping pests below acceptable <br /> levels. When pesticides are required, apply the least toxic and the least persistent <br /> pesticide that will provide adequate pest control. Do not apply pesticides on a <br /> prescheduled basis. <br /> 6. Sweep up spilled fertilizer and pesticides. Do not wash away or bury such spills, <br /> 7. Do not over apply pesticide. Spray only where the infestation exists. Follow the <br /> manufacturer's instructions for mixing and applying materials. <br /> 8. Only licensed, trained pesticide applicators shall apply pesticides. <br /> 9. Apply pesticides at the appropriate time to maximize their effectiveness and minimize <br /> the likelihood of discharging pesticides into runoff. With the exception of pre-emergent <br /> pesticides, avoid application if rain is expected. <br /> 10. Unwanted/unused pesticides shall be disposed as hazardous waste. <br /> Standing water shall not remain in the treatment measures for more than five days, to prevent <br /> mosquito generation. Should any mosquito issues arise, contact the San Mateo County Mosquito <br /> Abatement District (SMCMAD), as needed for assistance. Mosquito larvicides shall be applied <br /> only when absolutely necessary, as indicated by the SMCMAD, and then only by a licensed <br /> professional or contractor. Contact information for SMCMAD is provided below. <br /> Bioretention Area Maintenance Plan Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.