Laserfiche WebLink
7.1.H. - Page 27 Exhibit C <br /> Flow-Through Planter Maintenance Plan for <br /> Maple Street Correctional Center <br /> March 27, 2014 <br /> `I�y�' Project Address and Cross Streets: <br /> 1300 Maple St. Redwood City, CA <br /> (cross street: Blomciuist St) <br /> I <br /> Assessor's Parcel No <br /> Property Owner: <br /> San Mateo Co. Sheriffs Office <br /> Phone No (650) 216-7676 <br /> Designated Contact: Sam Lin <br /> Phone No (650) 632-4043 <br /> Mailing Address: <br /> ,d f, 0 San Mateo Co. Sheriffs Office <br /> ; : 400 County Center <br /> Flow-through planters are designed to treat and Redwood City, CA 94063 <br /> temporarily detain runoff without allowing <br /> seepage into the underlying soil. They typically <br /> receive runoff via downspouts leading from the <br /> roofs of adjacent buildings. <br /> The property contains 8 flow-through planter(s), located as described below and as shown in the <br /> attached site plan: <br /> • Flow-Through Planter No. K is located at the northwest corner of the proposed <br /> building. <br /> • Flow-Through Planter No. L is located between the housing and support building on <br /> the west side of the building. <br /> • Flow-Through Planter No. M is located at the southwest corner of the housing <br /> building. <br /> • Flow-Through Planter No. N is located between the housing and support building on <br /> the east side of the building. <br /> • Flow-Through Planter No. 0 is located at the south side of the housing building. <br /> • Flow-Through Planter No. Q is located at the northwest corner of the housing building, <br /> • Flow-Through Planter No. R is located at the east side of the housing building. <br /> • Flow-Through Planter No. S is located at the southeast corner of the housing building. <br /> I. Routine Maintenance Activities <br /> The principal maintenance objectives are to ensure that water flows unimpeded into the <br /> flow-through planter and landscaping remains attractive in appearance. Table 1 shows the <br /> routine maintenance activities, and the frequency at which they will be conducted. <br /> Flow-Through Planter Maintenance Plan Page 1 <br />