My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-05-12 Joint with Planning
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-05-12 Joint with Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2014 10:20:56 AM
Creation date
5/8/2014 4:38:52 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
5/12/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
519
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit C <br /> Flow-Through Planter <br /> Inspection and Maintenance Checklist <br /> Property Address: 1300 Maple Street. Redwood City_CA 94063 Property Owner: San Mateo Co. Sheriff's Office <br /> Treatment Measure No.: Date of Inspection: _ Type of Inspection: . Monthly , Pre-Wet Season <br /> , 1 After heavy runoff End of Wet Season <br /> Inspector(s): 1 Other' <br /> Defect Conditions When Maintenance Is Maintenance Comments (Describe maintenance Results Expected When <br /> Needed Needed?(YIN) completed and if needed maintenance was Maintenance Is Performed <br /> not conducted,note when it will be done) <br /> 1. Vegetation Vegetation is dead,diseased and/or Vegetation is healthy and attractive <br /> overgrown. in appearance. <br /> 2. Soil Soil too deep or too shallow. Soil is at proper depth(per soil <br /> specifications)for optimum filtration <br /> and flow. <br /> 3, Mulch Mulch is missing or patchy in All bare earth is covered, except <br /> appearance. Areas of bare earth are mulch is kept 6 inches away from <br /> exposed, or mulch layer is less than 3 trunks of trees and shrubs. Mulch is <br /> inches in depth. even in appearance, at a depth of 3 <br /> inches. <br /> 4. Sediment,Trash Sediment, trash and debris Sediment,trash and debris removed <br /> and Debris accumulated in the flow-through from flow-through planter and <br /> Accumulation planter. Planter does not drain as disposed of properly. Planter drains <br /> specified. within 3-4 hours. <br /> 5. Clogs Soil too deep or too shallow. Sediment, Planter drains per design <br /> trash and debris accumulated in the specifications. <br /> flow-through planter. Planter does not <br /> drain within five days after rainfall. <br /> 6. Downspouts and Flow to planter is impeded. Downspouts and sheet flow is <br /> Sheet Flow Downspouts are clogged or pipes are conveyed efficiently to the planter. <br /> damaged. Splash blocks and rocks in <br /> need of repair, replacement or <br /> replenishment. <br /> 7. Overflow Pipe Does not safely convey excess flows to Overflow pipe conveys excess flow <br /> storm drain. Piping damaged or to storm drain efficiently. <br /> disconnected. <br /> 8. Structural Planter is cracked, leaking or falling Cracks and leaks are repaired and <br /> Soundness apart. <br /> planter is structurally sound. _ <br /> 9. Miscellaneous Any condition not covered above that Meet the design specifications. <br /> needs attention in order for the flow- <br /> through planter to function as a) <br /> designed. <br /> Flow-Through Planter Maintenance Plan Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.