Laserfiche WebLink
7.1.H. - Page 33 Exhibit C <br /> 4 <br /> r .- <br /> • <br /> Figure 3.Residential construction increases the likelihood of sediment accumulation in permeable pavements(left).A pervi- <br /> ous asphalt pavement near Philadelphia,PA,is clogged due to runoff from an adjoining area that was not stabilized(right). <br /> placed upon snow and ice and is later plowed to a loca- (2) preventive street sweeping, (3)weeding,and (4) stain <br /> tion that drains to or on top of permeable pavement, a removal.Additionally, some pavement type-specific tasks <br /> clogging source is introduced to the pavement. Either include: (1)restorative street sweeping and(2)mowing. <br /> (1) preventing the stockpiling of snow on permeable Each of those inspection and maintenance activities <br /> pavement or(2) requiring post-event street sweeper is discussed in more detail. <br /> maintenance (discussed later) are two options of limit- <br /> ing winter weather induced clogging. <br /> Inspection <br /> Regular inspection is an essential part of permeable <br /> PRIMARY INSPECTION AND MAINTENANCE pavement maintenance. During the visit the pave- <br /> TASKS merit's surface can be examined for accumulated dust, <br /> Permeable pavement maintenance is rather straightfor sediment, and debris (Figure 4).A simple test to verify <br /> ward when compared to other stormwater management <br /> whether the pavement is infiltrating properly is to <br /> practices (such as bioretention, wet ponds, and storrnwa empty a bucket or large bottle of water on the pave- <br /> ter wetlands). The common inspection and maintenance ment and examine how long it takes for water to soak <br /> tasks are: (1)verifying that clogging has not occurred, through the pavement and the ``water mark"that is left. <br /> Pavements that require from several seconds to <br /> - . min- <br /> `i r t r . aid s iy r r r le <br /> - --,:'-' ‘. , ,,r,-- .. -r * ,,r..,,,,t...,; . „...,, . ....: , , , <br /> , _.:.,_..,,, .*:,,,,i,,,,_,,,. , ;,4 -*it elr r sH }�' �, r r : I- .. - .. <br /> d� 1 r <br /> r ! : r � r , <br /> Figure 4.Visual inspection of a pervious concrete lot in Georgia shows accumulation of both sediment and leaf debris(left). <br /> The fact that the lot is clogged is confirmed by emptying approximately 1 gallon of water on the lot,which subsequently <br /> runs off rather than infiltrating(right). <br /> Maintaining Permeable Pavements 3 <br />