Laserfiche WebLink
Exhibit C <br /> Flow-Through Planter Maintenance Plan for <br /> Maple Street Correctional Center <br /> March 27, 2014 <br /> �.` �` �� 1� �`� _ �`��'' Project Address and Cross Streets: <br /> � ''�' 1300 Maple St. Redwood Citv, CA <br /> �_ .: ��:��, �� <br /> (cross street: Blomquist St) <br /> Assessor's Parcel No: <br /> Property Owner: <br /> San Mateo Co. Sheriff's Office <br /> ^���� Phone No: (650) 216-7676 <br /> � Designated Contact: Sam Lin <br /> ����� �� •::��. <br /> ���������� : Phone No: (650) 632-4043 <br /> � Mailing Address: <br /> ' N � San Mateo Co. Sheriff s Office <br /> rw � <br /> " 400 Countv Center <br /> , <br /> �. �.: _,,,,. _.. <br /> Flow-through planters are designed to treat and Redwood Citv, CA 94063 <br /> temporarily detain runoff without allowing <br /> seepage into the underlying soil. They typically <br /> receive runoff via downspouts leading from the <br /> roofs of adjacent buildings. <br /> The property contains 8 flow-through planter(s), located as described below and as shown in the <br /> attached site plan: <br /> ■ Flow-Through Planter No. K is located at the northwest corner of the proposed <br /> building. <br /> ■ Flow-Through Planter No. L is located between the housing and support building on <br /> the west side of the building. <br /> ■ Flow-Through Planter No. M is located at the southwest corner of the housing <br /> building. <br /> ■ Flow-Through Planter No. N is located between the housing and support building on <br /> the east side of the building. <br /> ■ Flow-Through Planter No. O is located at the south side of the housing building. <br /> ■ Flow-Through Planter No. Q is located at the northwest corner of the housing building. <br /> ■ Flow-Through Planter No. R is located at the east side of the housing building. <br /> ■ Flow-Through Planter No. S is located at the southeast corner of the housing building. <br /> I. Routine Maintenance Activities <br /> The principal maintenance objectives are to ensure that water flows unimpeded into the <br /> flow-through planter and landscaping remains attractive in appearance. Table 1 shows the <br /> routine maintenance activities, and the frequency at which they will be conducted. <br /> Flow-Through Plar�ter Maintenance Plan Page 1 <br />