Laserfiche WebLink
525 Middlefield Rd <br /> V. Summary of Inspections and Maintenance: <br /> Summarize the following information��sing the attached Inspection and Maintenance <br /> Checklists: <br /> Identifying Date of Operation and Maintenance Activities Additional Comments <br /> Number of Inspection Perfanned end Date(s)Conducted <br /> Treatment <br /> Measure <br /> VI. Sediment Removal: <br /> Total amount of acctunulated sediment removed fro►n the stonnwater treatment <br /> measure(s)during the reporting period: cubic yards. <br /> How was sediment disposed? <br /> ❑ lan�ll <br /> ❑ other location on-site as described in and allowed by the maintenance <br /> plan <br /> ❑ oUier,explain <br /> Page 2 O&Mlnspection Report <br /> REV:03-21-14 VR <br /> Page 15 of 16 <br /> ATTY/AGR.2014.039ilndigo 525 Middlefield-Stormwater Agreement <br />