Laserfiche WebLink
The property contains permeable paver areas located within portions of Lots 1 through 5 and as shown <br /> in the attached site plan. <br /> V. Routine Maintenance Activitles for Permeable Paver Areas <br /> The principal maintenance objective is to prevent sedimeM buildup and clogging, which reduces <br /> pollutant removal efficiency and may lead to permeable paver area failure. Routine maintenance <br /> activities,and the frequency at which they will be conducted,are shown in Table 2. <br /> Table 2 <br /> Roufine Maintenance Activiti�for Permeable Paver Areas <br /> No. Mai�Menance Task Frequency of Task <br /> 1 Keep landscaped areas well maintained. Monthly,or as needed after storm <br /> events <br /> 2 Inspect the surface of the permeaWe pavers and w�uum End aF Winter(ApdQ <br /> clean using commercially available sweeping machines, Mid-summer(Juy/August) <br /> Afler aulumn leaf fall(November) <br /> 3 Inspect outlets.Remove trash and debris. 8efore wet season begins,w as <br /> needed <br /> 4 When vacuum deaning is conducted,insped pavers for During vacu�an deaning <br /> any signs of hydraulic failure. <br /> 5 Inspect permeable paver areas using the attached MoMhly,or after large stortn everrts, <br /> inspection checklist. and after removai of accumulated <br /> debris or material <br /> VI. Permeable Paver Area Inspections <br /> The attached Permeable Paver Area Inspection and Maintenance Checklist shall be used to conduct <br /> inspections monthly (or as needed), identify needed maintenance, and record maintenance that is <br /> conducted. <br /> REV:04-10-14 VR <br /> Page 15 of 15 <br /> ATTY/AGR.2014.051NALOTA DEVELOPMENT 1410 Valota_STMMA <br />