My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-06-23 Closed and Joint SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-06-23 Closed and Joint SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2014 5:44:54 PM
Creation date
6/19/2014 5:24:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
6/23/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.3.E. - Page 1 <br /> REPORT <br /> To the Honorable Mayor and City Council <br /> From the City Manager <br /> June 23, 2014 <br /> SUBJECT <br /> Updated engineering standards for public and private improvements <br /> RECOMMENDATION <br /> Approve, by resolution, the updated three volume document entitled "Engineering <br /> Standards for the City of Redwood City." <br /> BACKGROUND <br /> The Municipal Code (Chapter 29) requires that certain infrastructure improvements be <br /> constructed to standards as determined by the City Engineer. These Engineering <br /> Standards provide direction to engineers and developers regarding the minimum <br /> requirements for designing public right-of-way and private street improvements. These <br /> standards require periodic revision so that they continue to conform to current code and <br /> accommodate changes in construction technology, methods and materials. <br /> The City's Engineering Standards document contains three volumes: (1) Standard <br /> Technical Specifications, (2) City Standard Details and (3) Design Criteria. The existing <br /> version was significantly revised in December of 2006. Minor modifications were also <br /> made in July of 2008. The Standards are available to the public from the City's website, <br /> the Clerk's office, and the Engineering division. <br /> ANALYSIS <br /> The new and modified requirements are fully summarized in the staff report attached <br /> entitled "Summary of Revisions." The proposed revisions have been reviewed in detail <br /> by Engineering, Transportation, Planning, and Public Works Services staff. As noted <br /> above, the proposed changes will allow the standards to continue to conform to current <br /> code and will accommodate recent changes in construction technology, methods and <br /> materials. <br /> ALTERNATIVES <br /> Direct staff to additionally revise the Engineering Standards. <br /> FISCAL IMPACT <br /> There is no fiscal impact to the City as a result of this action. <br />
The URL can be used to link to this page
Your browser does not support the video tag.