My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-06-23 Closed and Joint SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-06-23 Closed and Joint SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2014 5:44:54 PM
Creation date
6/19/2014 5:24:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
6/23/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.3.E. - Page 6 ATTACHMENT 2 <br /> minimum of one and one half (1 1/2) inch. <br /> Fcathcring will not be permittcd. (deleted <br /> paragraph) <br /> A. The depth, width, and shape of the cut shall be as <br /> shown on the plans by a project-specific detail. If <br /> there is not project-specific-detail, the work shall <br /> be done as shown on City Standard Engineering <br /> Detail A-6. (New paragraph) <br /> B. Asphalt planning operations shall provide a final <br /> cut resulting in a uniform surface conforming to the <br /> typical cross sections, and be performed without <br /> damage to the surfacing to remain in place <br /> Overlays shall be minimum 2" instead of 1". (New <br /> paragraph) <br /> 3.07 ASPHALT CONCRETE SPOT RECONSTRUCTION <br /> (New subsection) <br /> A. This work shall consist of removing existing <br /> asphalt concrete surfacing and underlying base <br /> material and replacing the removed surfacing and <br /> base material with new asphalt concrete as shown <br /> on the plans and specified in these technical <br /> specifications. <br /> B. The exact limits of asphalt concrete surfacing to <br /> be removed and replaced will be determined by <br /> the Engineer. <br /> C. Existing surfacing and underlying base material <br /> removed during a work period shall be replaced <br /> before the lane is to be opened. <br /> D. A four-foot wide grind is required as shown on the <br /> plans and directed by the Engineer. <br /> E. Surfacing and base material shall be removed <br /> without damage to surfacing that is to remain in <br /> place. Damage to pavement which is to remain in <br /> place shall be repaired to a condition satisfactory <br /> to the Engineer. <br /> F. The material remaining in place, after removing <br /> surfacing and base material to the required depth, <br /> shall be graded to a plane, watered, and <br /> compacted. <br /> 1. The finished surface of the remaining <br /> material shall not extend above the grade <br /> established by the Engineer <br /> 2. Areas of the base material which are low or <br /> beyond the area approved by the Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.