My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-06-23 Closed and Joint SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-06-23 Closed and Joint SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2014 5:44:54 PM
Creation date
6/19/2014 5:24:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
6/23/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ArrACF 7.3.E. - Page 9 <br /> BLUE" in Redwood Shores area; or "CITY OF <br /> REDWOOD CITY LIME GREEN FIRE HYDRANT" <br /> at all other locations. Both paint colors are <br /> available from Benjamin Moore Paints. <br /> Substitution with other paint brands shall match <br /> these colors and quality; and shall be submitted to <br /> the City Engineer for approval. (Previously <br /> specified colors from Sherwin Williams are <br /> discontinued) <br /> 2.08 LOCATOR WIRE <br /> B. Connect locator wire to metallic fittings with <br /> Caldwell exothermic welding process and cover <br /> with Royston Handy Cap, or equal. Splice locator <br /> wires with brass wire split nuts. All exposed <br /> metallic wires and fittings shall be protected with <br /> Skotchkote 3M Electrical Coating or equal; and <br /> covered with Skotchkote 3M Electrical Tape or <br /> equal. (New paragraph) <br /> 3.04 CONNECTION TO EXISTING SYSTEMS <br /> C. Before cutting the existing main the Contractor <br /> shall be prepared with a dewatering pump to keep <br /> the trench dewatered to prevent muddy water from <br /> reaching the pipes. Dewatering operations shall <br /> be lawfully performed. (New paragraph) <br /> 3.05 PRESSURE TEST AND LEACKAGE TEST <br /> The subsection was completely re-written to describe <br /> the process in detail. <br /> 3.06 DISINFECTION AND BACTERIOLOGICAL TEST <br /> The subsection was completely re-written to describe <br /> the process in detail; and to import the essence of the <br /> American Water Works Association (AWWA) <br /> Standard C651-05 and the California Department of <br /> Health requirements. <br /> 3.07 HIGH VELOCITY FLUSH TEST <br /> A. The Fire Department is no longer required to <br /> witness these tests. The City Inspector is now <br /> designated. <br /> SECTION 02661 CATHODIC PROTECTION <br /> 2.02 WIRES <br />
The URL can be used to link to this page
Your browser does not support the video tag.