My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Green Charge Networks and PG&E - 399 Marine Pkwy
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Under 60K
>
Agmt14 Green Charge Networks and PG&E - 399 Marine Pkwy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2014 12:31:17 PM
Creation date
8/13/2014 12:31:12 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Green Charge Networks LLC and PG&E
PROJECT NAME
DC Fast chargers at 399 Marine Pkwy Generation Agmt and Interconection Agmt
RMP File Number
304.5
Date
6/16/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pas�fie Gas and PG&E Log No. 600144286 <br /> Account# 0637173191 <br /> Electric Company.:., Order# <br /> � ��.' <br /> �� ���',V�� �����Y r�CUSTOMER GENERATION AGREEMENT <br /> (3�d PARTY GENERATOR ON PREMISES, <br /> NON-EXPORTING) <br /> This Customer Generation Agreement(3'd Party Generator on Premises, Non-Exporting) (Agreement) <br /> is entered into by and between City Of Redwood City , a <br /> Green Charge Networks (Customer), and Pacific Gas and Electric <br /> Company (PG&E), a California Corporation. Customer and PG&E are sometimes also referred to in <br /> this Agreement jointly as"Parties" or individually as"Party." In consideration of the mutual promises <br /> and obligations stated in this Agreement and its attachments, the Parties agree as follows: <br /> 1. SCOPE, PURPOSE, AND RELATED AGREEMENTS <br /> This Agreement, in conjunction with the Generating Facility/nterconnection Agreement (3'd <br /> Party Non-Exporting(Form 79-988), identified in Section 2.2 and attached as Appendix A, <br /> allows the Producer(as identified in Section 2.2) to utilize Customer's electrical facilities to <br /> interconnect and operate the Generating Facility in parallel with PG&E's Distribution System. <br /> The purpose of the Generating Facility is to serve the Customer's electrical loads at the <br /> location identified in Section 2.1. <br /> 2. SUMMARY AND DESCRIPTION OF THE PARTIES AND LOCATION OF GENERATING <br /> FACILITY <br /> 2.1 The name and address used by PG&E to locate the Customer or electric service <br /> account where the Generating Facility interconnects with PG&E's Distribution System <br /> is: <br /> City of Redwood City <br /> 399 Marine Pkwy <br /> Redwood City, CA 94065 <br /> 2.2 The Generating Facility shall be Interconnected with PG&E's Distribution System <br /> pursuant to the Generating Facility Interconnection Agreement(3ro Party Non- <br /> Exporting) between PG&E and Green Char�e Networks , <br /> its successors or assigns (Producer) dated <br /> (Producer Agreement): <br /> Automated Document, Preliminary Statement Part A Form 79-992 <br /> Advice 4110-E <br /> Revised September 2012 <br /> Page 1 of 7 <br /> REV:06-12-14 MLG <br />
The URL can be used to link to this page
Your browser does not support the video tag.