My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 American Asphalt Repair and Resurfacing Co.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 American Asphalt Repair and Resurfacing Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2014 4:57:30 PM
Creation date
11/17/2014 4:56:35 PM
Metadata
Fields
Template:
Agreement
Contractor Name
American Asphalt Repair and Resurfacing Co.
PROJECT NAME
2013-2014 Slurry Seal Project
RMP File Number
304
Date
11/10/2014
MO Ref
14-146
Sticky Note
ID:
1
Text:
Faithful Peformance Bond pages 5-8.
Payent Bond pages 9-12.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. .___ r __-__` ._ _____�-_ _ . <br /> ' • • r• I i+�O'�'���� <br /> AGREEMENT <br /> for the <br /> City of Redwood City <br /> 2013-2014 SLURRY SEAL PROJECT <br /> THI AGREEM T ade this�day of , 2014, by and befinreen�G�-- <br /> �S�p_� hose place of business is at � � hereinafter called <br /> "CC ITRACT R", and the City of Redwood City, a Charter ity and municipal corporation of the <br /> State of California, hereinafter referred to as "CITY". <br /> In consideration of the mutual covenants hereinafter set forth, Contractor and City agree as <br /> follows: <br /> I. WORK <br /> A. Contractor shall complete all Work specified in the Contract documents, in <br /> accordance with the Specifications, Drawings, and all other terms and conditions of <br /> the Contract documents. <br /> II. CONTRACT SUM <br /> A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br /> accordance with the Contract documents, as the amount of Seven Hundred Sixty- <br /> Two Thousand,Three Hundred Twenty and 74/100 Dollars($762,320.74),computed <br /> in accordance with Contractor's Accepted Ffepesal Bid dated, August 14, 2014, <br /> which J�epesa� Bid is incorporated herein by reference thereto as if fully set forth. <br /> B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br /> taxes on materials and equipment, and labor furnished by Contractor, its <br /> subcontractors, subconsultants, architects, engineers, and vendors or otherwise <br /> arising out of Contractor's performance of the Work, including any increases in any <br /> such taxes during the term of this Agreement; and any duties, fees, and royalties <br /> imposed with respect to any materials and equipment, labor or services. The taxes <br /> covered hereby include (but are not limited to) occupational, sales, use, excise, <br /> unemployment, FICA, and income taxes, customs, duties, and any and all other taxes <br /> on any item or service that is part of the Work, whether such taxes are normally <br /> included in the price of such item or service or are normally stated separately. <br /> Notwithstanding the foregoing, each party shall bear such state or local inventory, real <br /> property, personal property or fixtures taxes as may be properly assessed against it <br /> by applicable taxing authorities. <br /> III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> A. Contractor shall complete the Work within the following Schedule reflecting the date <br /> the Contract Time commences to run as set forth in Section 00550 (Notice to <br /> Proceed) and Section 00700 (General Conditions); and <br /> 1. Contractor shall achieve Substantial Completion of the Work within forty-five(45) <br /> Calendar Days from the date the Contract Time commences to run. <br /> B. Liauidated Damaqes <br /> 1. City and Contractor recognize that time is of the essence of this Agreement <br /> AGREEMENT <br /> 2013-2014 SLURRY SEAL PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.