Laserfiche WebLink
<br />_.-. --------_._~_._-_._------_.__._---_._.......__......_-.---.-. -~--_.~--"._--------'-"-- -.-.... . <br /> <br />ORIGINAL <br /> <br />AGREEMENT <br /> <br />THE CITY OF REDWOOD CITY, a municipal corporation in the State of California, <br />hereinafter referred to as "City", and MCH GENERAL ENGINEERING <br />CONTRACTORS, INC. of San Jose, California, hereinafter referred to as "Contractor", <br />for the consideration hereinafter stated, hereby agree as follows: <br /> <br />1. Contractor shall perform everything required to be performed, shall provide and <br />furnish all of the labor, equipment, materials, and tools to perform, within Fifteen <br />(15) calendar days after the NOTICE TO PROCEED, the following work: <br /> <br />2000-2001 BIKE PATH IMPROVEMENT PROJECT <br /> <br />in strict accordance with the Plans, Contract Documents and Specifications <br />pertaining thereto and signed by the Manager, Engineering and Construction of <br />Redwood City, which Documents are incorporated herein and made a part of this <br />Agreement as if herein fully set forth. <br /> <br />2. City shall pay to Contractor, as full consideration for the faithful performance by <br />Contractor of the aforementioned work, the amount of Two Hundred Four <br />Thousand Two Hundred Fifty-eight and No/100 Dollars ($204,258.00) computed in <br />accordance with Contractor's accepted Proposal dated March 27, 2001, which <br />accepted Proposal is incorporated herein by reference thereto as if herein fully set <br />forth. <br /> <br />3. All of the work to be done shall be done under the direction and supervision of, <br />and to the approval of, City or its authorized representative, and the work shall be <br />done in the best workmanlike manner, conforming strictly to the provisions of the <br />specifications and plans made thereof. <br /> <br />4. (a) Contractor shall comply with all applicable provisions of Section 1810 to 1815, <br />inclusive, of the California labor Code relating to working hours. Contractor <br />shall, as a penalty to City, forfeit Twenty five and No/100 Dollars ($25.00) for <br />each worker employed in the execution of the Contract by Contractor or by any <br />subcontractor for each calendar day during which such worker is required or <br />permitted to work more than 8 hours in anyone calendar day and 40 hours in <br />anyone calendar week, unless such worker receives compensation for all <br />hours Worked in excess of eight (8) hours at not less than 1-1/2 times the basic <br />rate of pay. <br /> <br />(b) Pursuant to the provision of California labor Code, Sections 1770 et seq. <br />Contractor and any subcontractor under him shall pay not less than the <br />prevailing rate of per diem wages as determined by the Director of the <br />California Department of Industrial Relations. Pursuant to the provisions of <br />California labor Code Section 1773.2, Contractor is hereby advised that copies <br />of the prevailing rate of per diem wages and a general prevailing rate for <br />holidays, Saturdays and Sundays and overtime work in the locality in which the <br />work is to be performed for each craft, classification, or type of worker required <br />to execute the Contract, are on file in the office of the City Clerk, which copies <br /> <br />Agmt-473 <br />F:Shared/Redwood/Councii <br />DES:djk <br />04/10/01 <br />