Laserfiche WebLink
<br /> DES:ð':"~ 03/26/96 (002/70) <br /> ORIGINAL <br /> A G R E E MEN T <br /> --------- <br /> THE CITY OF REDWOOD CITY, a municipal corporation of the <br />State of California, hereinafter referred to as "City", and <br />S.G. BARBER CONSTRUCTION, INC. of Belmont, California, <br />hereinafter referred to as "Contractor", for the consideration <br />hereinafter stated, hereby agree as follows: <br /> 1. Contractor shall perform everything required to be <br />performed, shall provide and furnish all of the labor, equipment, <br />materials, and tools to perform within Ninety (90) calendar days <br />after the NOTICE TO PROCEED, the following work: <br /> EDGEWOOD/GLENLOCH PUMP STATIONS STAND-BY POWER PROJECT <br />in strict accordance with the Plans, Contract Documents and <br />Specifications pertaining thereto and signed by the City Engineer <br />of Redwood City, which Plans, Contract Documents and <br />Specifications are incorporated herein and made a part of this <br />Agreement as if herein fully set forth. <br /> 2. City shall pay to Contractor, as full consideration for <br />the faithful performance by Contractor of the aforementioned <br />work, the amount of One Hundred Forty-three Thousand Three <br />Hundred Fifty-one and No/lOO Dollars ($143,351.00) computed in <br />accordance with Contractor's accepted proposal dated March 20, <br />1996, which accepted proposal is incorporated herein by reference <br />thereto as if herein fully set forth. <br /> 3. All of the work to be done shall be done under the <br />direction and supervision of, and to the approval of, City or its <br />authorized representative, and the work shall be done in the best <br /> ........, ....'.. .. <br />