Laserfiche WebLink
AGREEMENT <br /> <br />THE CITY OF REDWOOD CITY, a municipal corporation in the State of California, <br />hereinafter referred to as "City", and S.G. Barber Construction Inc.. of Belmont, California, <br />hereinafter referred to as "Contractor", for the consideration hereinafter stated, hereby agree as <br />follows: <br /> <br /> 1. Contractor shall perform everything required to be performed, shall provide and furnish all <br /> of the labor, equipment, materials, and tools to perform, within Sixty (60) calendar days <br /> after the NOTICE TO PROCEED the following work: <br /> <br /> 2001 4002 TRENCH REPAIR PROJECT <br /> <br /> in strict accordance with the Plans, Contract Documents and Specifications pertaining <br /> thereto and signed by the City Engineer of Redwood City, which Documents are <br /> incorporated herein and made a part of this Agreement as if herein fully set forth. <br /> <br /> 2. City shall pay to Contractor, as full consideration for the faithful performance by Contractor <br /> of the aforementioned work, the amount of One Hundred Fif~ Thousand Dollars <br /> ($150,000.00) computed in accordance with Contractor's accepted Proposal dated August <br /> 22, 2001 which accepted Proposal is incorporated herein by reference thereto as if herein <br /> fully set forth. <br /> <br /> 3. All of the work to be done shall be done under the direction and supervision of, and to the <br /> approval of, City or its authorized representative, and the work shall be done in the best <br /> workmanlike manner, conforming strictly to the provisions of the specifications and plans <br /> made thereof. <br /> <br /> 4. (a) Contractor shall comply with all applicable provisions of Section 1810 to 1815, inclusive, <br /> of the California Labor Code relating to working hours. Contractor shall, as a penalty to <br /> City, forfeit Twenty five and No/100 Dollars ($25.00) for each worker employed in the <br /> execution of the Contract by Contractor or by any subcontractor for each calendar day <br /> during which such worker is required or permitted to work more than 8 hours in any one <br /> calendar day and 40 hours in any one calendar week, unless such worker receives <br /> compensation for all hours Worked in excess of eight (8) hours at not less than 1-1/2 <br /> times the basic rate of pay. <br /> <br /> (b) Pursuant to the provision of Califomia Labor Code, Sections 1770 et seq. Contractor <br /> and any subcontractor under him shall pay not less than the prevailing rate of per diem <br /> wages as determined by the Director of the California Department of Industrial <br /> Relations. Pursuant to the provisions of California Labor Code Section 1773.2, <br /> Contractor is hereby advised that copies of the prevailing rate of per diem wages and a <br /> general prevailing rate for holidays, Saturdays and Sundays and overtime work in the <br /> locality in which the work is to be performed for each craft, classification, or type of <br /> worker required to execute the Contract, are on file in the office of the City Clerk, which <br /> copies shall be made available to any interested party on request. Contractor shall post t( <br /> copy of said prevailing rate of per diem wages at each job site. <br /> <br />Agmt-181 1 <br />DES:djk <br />Shared/Redwood/Council <br />05/01/01 <br /> <br /> <br />