My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt00 Arco Painting
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2000
>
Agmt00 Arco Painting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2005 10:48:48 AM
Creation date
5/13/2002 1:19:59 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Arco Painting
PROJECT NAME
Civic facilities painting
RMP File Number
304
Date
6/26/2000
Reso Ref
13869 13912
MO Ref
00-334
Box
6037
Sticky Note
ID:
1
Text:
1 agreement
9 Notice of Completion
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ORIGINAL <br /> <br />AGREEMENT <br /> <br />THE CITY OF REDWOOD CITY, a municipal corporation in the State of California, <br />hereinafter referred to as "City", and ARCO PAINTING CO. of San Francisco, <br />California, hereinafter referred to as "Contractor", for the consideration hereinafter <br />stated, hereby agree as follows: <br /> <br />1. Contractor shall perform everything required to be performed, shall provide and <br />furnish all of the labor, equipment, materials, and tools to perform within Two <br />Hundred Seventy (270) calendar days after the NOTICE TO PROCEED, the <br />following work: <br /> <br />FISCAL YEAR 1999-2000 CIVIC FACILITIES PAINTING PROJECT <br /> <br />in strict accordance with the Plans, Contract Documents and Specifications <br />pertaining thereto and signed by the City Engineer of Redwood City, which <br />Documents are incorporated herein and made a part of this Agreement as if herein <br />fully set forth. <br /> <br />2. City shall pay to Contractor, as full consideration for the faithful performance by <br />Contractor of the aforementioned work, the amount of One Hundred Forty-five <br />Thousand Three Hundred Seventy and No/100 Dollars ($145,370.00) computed in <br />accordance with Contractor's accepted Proposal dated May 21, 2000, which <br />accepted Proposal is incorporated herein by reference thereto as if herein fully set <br />forth. <br /> <br />3. All of the work to be done shall be done under the direction and supervision of, <br />and to the approval of, City or its authorized representative, and the work shall be <br />done in the best workmanlike manner, conforming strictly to the provisions of the <br />specifications and plans made thereof. <br /> <br />4. (a) Contractor shall comply with all applicable provisions of Section 1810 to 1815, <br />inclusive, of the California Labor Code relating to working hours. Contractor <br />shall, as a penalty to City, forfeit Twenty five and No/100 Dollars ($25.00) for <br />each worker employed in the execution of the Contract by Contractor or by any <br />subcontractor for each calendar day during which such worker is required or <br />permitted to work more than 8 hours in anyone calendar day and 40 hours in <br />anyone calendar week, unless such worker receives compensation for all <br />hours Worked in excess of eight (8) hours at not less than 1-1/2 times the basic <br />rate of pay. <br /> <br />(b) Pursuant to the provision of California Labor Code, Sections 1770 et seq. <br />Contractor and any subcontractor under him shall pay not less than the <br />prevailing rate of per diem wages as determined by the Director of the <br />California Department of Industrial Relations. Pursuant to the provisions of <br />California Labor Code Section 1773.2, Contractor is hereby advised that <br />copies of the prevailing rate of per diem wages and a general prevailing rate <br />for holidays, Saturdays and Sundays and overtime work in the locality in which <br /> <br />Agmt-359 <br />FlshlshlRCICouncii <br />DES:djk <br />05/31/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.