My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 Bay Area Paving (2)
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 Bay Area Paving (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:31:58 PM
Creation date
4/19/2005 11:08:04 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Bay Area Paving
PROJECT NAME
sewer & water maintenance
RMP File Number
304
Date
4/9/1999
Reso Ref
13592
Box
5901
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ORIGINAL <br /> <br />DES:djk 03/29/99 <br />F: Shared/Redwood/Council/ Agmt- 249 <br /> <br />AGREEMENT <br /> <br />THE CITY OF REDWOOD CITY, a municipal corporation in the State of California, <br />hereinafter referred to as "Oty", and BAY AREA PAVING CO., INC. of San Mateo, <br />California, hereinafter referred to as "Contractor", for the consideration hereinafter stated, <br />hereby agree as follows: <br /> <br />1. Contractor shall perform everything required to be performed, shall provide and furnish <br />all of the labor, equipment, materials, and tools to perform within Fourteen (14) calendar <br />days after the NOTlCETOPROCEEÐ, the following work: <br /> <br />1999 SANITARY SEWER AND WATER SYSTEM MAINTENANCE <br /> <br />SIDEWALK REPAIR SERVICES <br /> <br />in strict accordance with the Plans, Contract Documents and Specifications pertaining <br />thereto and signed by the Oty Engineer of Redwood aty, which Documents are <br />incorporated herein and made a part of this Agreement as if herein fully set forth. <br /> <br />2. aty shall pay to Contractor, as full consideration for the faithful performance by <br />Contractor of the aforementioned work, the amount of Fifteen Thousand Three Hundred <br />Sixty and No/1 00 Dollars ($15,360.00) computed in accordance with Contractor's <br />accepted Proposal dated March 11, 1999, which accepted Proposal is incorporated <br />herein by reference thereto as if herein fully set forth. <br /> <br />3. All of the work to be done shall be done under the direction and supervision of, and to <br />the approval of, Otyor its authorized representative, and the work shall be done in the <br />best workmanlike manner, conforming strictly to the provisions of the specifications and <br />plans made thereof. <br /> <br />4. (a) Contractor shall comply with all applicable provisions of Section 181 0 to 1815, <br />inclusive, of the California Labor Code relating to working hours. Contractor shall, as <br />a penalty to aty, forfeit Twenty five and No/1 00 Dollars ($25.00) for each worker <br />employed in the execution of the Contract by Contractor or by any subcontractor for <br />each calendar day during which such worker is required or permitted to work more <br />than 8 hours in anyone calendar day and 40 hours in anyone calendar week, <br />unless such worker receives compensation for all hours Worked in excess of eight <br />(8) hours at not less than 1-1/ 2 times the basic rate of pay. <br /> <br />(b) Pursuant to the provision of California Labor Code, Sections 1770 et seq. <br />Contractor and any subcontractor under him shall pay not less than the prevailing <br />rate of per diem wages as determined by the Director of the California Department <br />of Industrial Relations. Pursuant to the provisions of California Labor Code Section <br />1773.2, Contractor is hereby advised that copies of the prevailing rate of per diem <br />wages and a general prevailing rate for holidays, Saturdays and Sundays and <br />overtime work in the locality in which the work is to be performed for each craft, <br />classification, or type of worker required to execute the Contract, are on file in the <br />office of the aty Oerk, which copies shall be made available to any interested party <br />on request. Contractor shall post a copy of said prevailing rate of per diem wages at <br />each job site. <br /> <br />(c) As required by Section 1773.8 of the California Labor Code, Contractor shall pay <br />travel and subsistence payments to each worker needed to execute the work, as <br /> <br />-_.. T <br />
The URL can be used to link to this page
Your browser does not support the video tag.