My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt00 RGW Construction
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2000
>
Agmt00 RGW Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 9:30:06 AM
Creation date
7/18/2005 9:52:59 AM
Metadata
Fields
Template:
Agreement
Contractor Name
RGW Construction
PROJECT NAME
Redwood Shores Street System Improvement
RMP File Number
304
Date
1/4/2001
Reso Ref
14091
MO Ref
02-87
Box
5940
Sticky Note
ID:
1
Text:
1 Agreement
8 Notice of Completion
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ORIGINAL <br /> <br />AGREEMENT <br /> <br />THE CITY OF REDWOOD CITY, a municipal corporation in the State of California, hereinafter <br />referred to as "City", and RGW CONSTRUCTION INC. of Livermore, California, hereinafter <br />referred to as "Contractor", for the consideration hereinafter stated, hereby agree as follows: <br /> <br />1. Contractor shall perform everything required to be performed, shall provide and furnish all <br />of the labor, equipment, materials, and tools to perform, within One Hundred Thirty (130) <br />calendar days after the NOTICE TO PROCEED, the following work: <br /> <br />REDWOOD SHORES STREET SYSTEM IMPROVEMENTS PROJECT <br /> <br />3. <br /> <br />in strict accordance with the Plans, Contract Documents and Specifications pertaining <br />thereto and signed by the City Engineer of Redwood City, which Documents are <br />incorporated herein and made a part of this Agreement as if herein fully set forth. <br /> <br />City shall pay to Contractor, as full consideration for the faithful performance by Contractor <br />of the aforementioned work, the amount of Two Million Two Hundred Twenty-nine <br />Thousand Three Hundred Twenty-three and 55/100 ($2,229,323.55), computed in <br />accordance with Contractor's accepted Proposal dated October 18, 2000, which accepted <br />Proposal is incorporated herein by reference thereto as if herein fully set forth. <br /> <br />All of the work to be done shall be done under the direction and supervision of, and to the <br />approval of, City or its authorized representative, and the work shall be done in the best <br />workmanlike manner, conforming strictly to the provisions of the specifications and plans <br />made thereof. <br /> <br />2. <br /> <br />4. (a) Contractor shall comply with all applicable provisions of Section 1810 to 1815, inclusive, <br />of the California Labor Code relating to working hours. Contractor shall, as a penalty to <br />City, forfeit Twenty five and No/100 Dollars ($25.00) for each worker employed in the <br />execution of the Contract by Contractor or by any subcontractor for each calendar day <br />during which such worker is required or permitted to work more than 8 hours in anyone <br />calendar day and 40 hours in anyone calendar week, unless such worker receives <br />compensation for all hours Worked in excess of eight (8) hours at not less than 1-1/2 <br />times the basic rate of pay. <br /> <br />(b) Pursuant to the provision of California Labor Code, Sections 1770 et seq. Contractor <br />and any subcontractor under him shall pay not less than the prevailing rate of per diem <br />wages as determined by the Director of the California Department of Industrial <br />Relations. Pursuant to the provisions of California Labor Code Section 1773.2, <br />Contractor is hereby advised that copies of the prevailing rate of per diem wages and a <br />general prevailing rate for holidays, Saturdays and Sundays and overtime work in the <br />locality in which the work is to be performed for each craft, classification, or type of <br />worker required to execute the Contract, are on file in the office of the City Clerk, which <br />copies shall be made available to any interested party on request. Contractor shall <br />post a copy of said prevailing rate of per diem wages at each job site. <br /> <br />(c) As required by Section 1773.8 of the California Labor Code, Contractor shall pay travel <br />and subsistence payments to each worker needed to execute the work, as such travel <br /> <br />Agmt-418 <br />DES:djk <br />F: / S hared/Re d w oodl Co une il <br />11/06/00 <br /> <br />1 <br /> <br />------------r-------- - <br />
The URL can be used to link to this page
Your browser does not support the video tag.