Laserfiche WebLink
<br />0 1\ n..HI ~AL <br /> <br /><11'. '\¡ I, <br />...'Lv <br />,~"", ... VI <br />~ .., V' ¥ <br />". \ " y: <br />,I"~" <br />~~~. <br /> <br />AGREEMENT <br /> <br />THE CITY OF REDWOOD CITY, a municipal corporation in the State of California, hereinafter <br />referred to as "City", and GraniteRock Company of Redwood City, California, hereinafter <br />referred to as "Contractor", for the consideration hereinafter stated, hereby agree as follows: <br /> <br />1. Contractor shall perform everything required to be performed, shall provide and furnish <br />all of the labor, equipment, materials, and tools to perform, within Three Hundred sixty- <br />five (365) calendar days after the NOTICE TO PROCEED, the following work: <br /> <br />2001-2002 ASPHALT-CONCRETE MATERIALS <br /> <br />2. <br /> <br />in strict accordance with the Plans, Contract Documents and Specifications pertaining <br />thereto and signed by the City Engineer of Redwood City, which Documents are <br />incorporated herein and made a part of this Agreement as if herein fully set forth. <br /> <br />City shall pay to Contractor, as full consideration for the faithful performance by <br />Contractor of the aforementioned work, the amount of One Hundred Seventy-Five <br />Thousand Sixty-two and 60/100 ($175,062.60), computed in accordance with <br />Contractor's accepted Proposal dated July 17, 2001, which accepted Proposal is <br />incorporated herein by reference thereto as if herein fully set forth. <br /> <br />(a) All of the work to be done shall be done under the direction and supervision of, and <br />to the approval of, City or its authorized representative, and the work shall be done in the <br />best workmanlike manner, conforming strictly to the provisions of the specifications and <br />plans made thereof. <br /> <br />3. <br /> <br />4. <br /> <br />(a) Contractor shall comply with all applicable provisions of Section 1810 to 1815, <br />inclusive, of the California Labor Code relating to working hours. Contractor shall, as a <br />penalty to City, forfeit Twenty five and No/100 Dollars ($25.00) for each worker employed <br />in the execution of the Contract by Contractor or by any subcontractor for each calendar <br />day during which such worker is required or permitted to work more than 8 hours in any <br />one calendar day and 40 hours in anyone calendar week, unless such worker receives <br />compensation for all hours Worked in excess of eight (8) hours at not less than 1-1/2 <br />times the basic rate of pay. <br /> <br />(b) Pursuant to the provision of California Labor Code, Sections 1770 et seq. Contractor <br />and any subcontractor under him shall pay not less than the prevailing rate of per diem <br />wages as determined by the Director of the California Department of Industrial Relations. <br />Pursuant to the provisions of California Labor Code Section 1773.2, Contractor is hereby <br />advised that copies of the prevailing rate of per diem wages and a general prevailing rate <br />for holidays, Saturdays and Sundays and overtime work in the locality in which the work <br />is to be performed for each craft, classification, or type of worker required to execute the <br />Contract, are on file in the office of the City Clerk, which copies shall be made available <br />to any interested party on request. Contractor shall post a copy of said prevailing rate of <br />per diem wages at each job site. <br /> <br />(c) As required by Section 1773.8 of the California Labor Code, Contractor shall pay <br />travel and subsistence payments to each worker needed to execute the work, as <br />Agmt-381 <br />DES:djk <br />F: Shared/RedwoodlCouncil <br />08/02/00 <br /> <br />00200-1 <br /> <br />. ""'--'--"'. <br />