My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 City of Menlo Park, Town of Atherton, and County of San Mateo MOU Bayfront Canal and Atherton Channel
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 City of Menlo Park, Town of Atherton, and County of San Mateo MOU Bayfront Canal and Atherton Channel
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2018 3:49:33 PM
Creation date
1/18/2018 3:49:04 PM
Metadata
Fields
Template:
Agreement
Contractor Name
City of Menlo Park, Town of Atherton, and County of San Mateo Bayfront Canal and Atherton Channel
PROJECT NAME
MOU Bayfront Canal and Atherton Channel Flood Management and Restoration Project
RMP File Number
304
Date
10/27/2017
MO Ref
17-180
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COPY <br />MEMORANDUM OF UNDERSTANDING AMONG <br />THE CITY OF REDWOOD CITY, CITY OF MENLO PARK, <br />TOWN OF ATHERTON, AND COUNTY OF SAN MATEO <br />(BAYFRONT CANAL AND ATHERTON CHANNEL <br />FLOOD MANAGEMENT AND RESTORATION PROJECT) <br />This Memorandum of Understanding ("MOU") is made and entered into this .27 day of <br />October , 2017 by and between the City of Redwood City, the City of Menlo Park, and the <br />Town of Atherton ("Cities"), municipal corporations of the State of California, and the County of <br />San Mateo ("County"), collectively referred to as Bayfront Canal/Atherton Channel <br />Collaborative ("Collaborative"). <br />1. Purpose. The purpose of this MOU is to establish the terms and <br />conditions for the cost sharing and responsibilities for the design phase of the Bayfront Canal <br />and Atherton Channel Flood Management and Restoration Project (hereinafter referred to as <br />"PROJECT"), which will include the engineering planning, design drawings, technical <br />specifications, and cost estimates; environmental compliance and construction permitting; and <br />securing property access rights necessary to initiate construction bidding. This includes initial <br />site surveys, hydraulic analysis, environmental and construction permitting approval, design <br />drawings, specifications and engineering design estimates for the Bayfront Canal and Atherton <br />Channel Flood Management and Restoration Project, as listed in the "Scope" section of Exhibit <br />A to this MOU titled, Bayfront Canal and Atherton Channel Flood Management and Restoration <br />Project. This MOU is for design only, does not include construction and operation and <br />maintenance activities, and does not bind any member agency's participation in construction or <br />operations and maintenance activities, but it may serve as a template for future agreements with <br />the Collaborative. <br />This MOU outlines responsibilities for the first of a series of projects that will provide a regional <br />approach for flood risk management. The Collaborative will maintain a comprehensive list of the <br />current known flood risk reduction projects in the Bayfront Canal and Atherton Channel <br />watersheds. Contributing percentages,as shown in Section 5 of the MOU and Exhibit A, will be <br />used to determine the initial expected financial contribution of each member in the Collaborative. <br />The flow contributions will be reviewed in the initial hydraulic modeling task performed by the <br />design consultant, and confirmed by the Collaborative. This MOU and Exhibit A describes the <br />process to modify contribution percentages following the consultant's hydraulic analysis. <br />Additional projects that could impact flow contributions,including but not limited to the projects <br />described in Table 2 of Exhibit A, will not be included until significant design and funding of <br />those projects is completed. <br />PROJECT construction, operation, and maintenance cost responsibilities will be addressed in <br />future Agreements, or MOUs,subj ect to the agreement of all parties. <br />20171024_Bayrront_MOU Final <br />
The URL can be used to link to this page
Your browser does not support the video tag.