My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 Hydrotech, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 Hydrotech, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2005 12:10:31 PM
Creation date
9/20/2005 10:16:26 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Hydrotech, Inc
PROJECT NAME
Goodwin Avenue sewer main replacement
RMP File Number
304
Date
5/14/1999
Reso Ref
13537 13559
MO Ref
99-161
Box
6039
Sticky Note
ID:
1
Text:
1 agreement
8 notice of completion
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ORIGINAL <br /> <br />DES:djk 02/04/99 <br />F: Shar<.-ul Redwood/CounciJ! Agmt - 226 <br /> <br />AGREEMENT <br /> <br />THE CITY OF REDWOOD CITY, a municipal corporation in the State of California, <br />hereinafter referred to as "City", and HYDROTECH, INC. of Fernley, Nevada, hereinafter <br />referred to as "Contractor", for the consideration hereinafter stated, hereby agree as <br />follows: <br /> <br />1. Contractor shall perform everything required to be performed, shall provide and <br />furnish all of the labor, equipment, materials, and tools to perform within Thirty (30) <br />calendar days after the NOTICE TO PROCEED, the following work: <br /> <br />GOODWIN AVENUE SEWER MAIN REPLACEMENT PROJECT <br /> <br />in strict accordance with the Plans, Contract Documents and Specifications <br />pertaining thereto and signed by the City Engineer of Redwood City, which <br />Documents are incorporated herein and made a part of this Agreement as if herein <br />fully set forth. <br /> <br />2. City shall pay to Contractor, as full consideration for the faithful performance by <br />Contractor of the aforementioned work, the amount of Ninety-four Thousand Four <br />Hundred Eight and No/100 Dollars ($94,408.00) computed in accordance with <br />Contractor's accepted Proposal dated February 2, 1999, which accepted Proposal <br />is incorporated herein by reference thereto as if herein fully set forth. <br /> <br />3. All of the work to be done shall be done under the direction and supervision of, and <br />to the approval of, City or its authorized representative, and the work shall be done <br />in the best workmanlike manner, conforming strictly to the provisions of the <br />specifications and plans made thereof. <br /> <br />4. (a) Contractor shall comply with all applicable provisions of Section 1810 to 1815, <br />inclusive, of the California Labor Code relating to working hours. Contractor <br />shall, as a penalty to City, forfeit Twenty five and No/100 Dollars ($25.00) for <br />each worker employed in the execution of the Contract by Contractor or by any <br />subcontractor for each calendar day during which such worker is required or <br />permitted to work more than 8 hours in anyone calendar day and 40 hours <br />in anyone calendar week, unless such worker receives compensation for all <br />hours Worked in excess of eight (8) hours at not less than 1-1/2 times the basic <br />rate of pay. <br /> <br />(b) Pursuant to the provision of California Labor Code, Sections 1770 et seq. <br />Contractor and any subcontractor under him shall pay not less than the <br />prevailing rate of per diem wages as determined by the Director of the <br />California Department of Industrial Relations. Pursuant to the provisions of <br />California Labor Code Section 1773.2, Contractor is hereby advised that copies <br />of the prevailing rate of per diem wages and a general prevailing rate for <br />holidays, Saturdays and Sundays and overtime work in the locality in which the <br />work is to be performed for each craft, classification, or type of worker required <br />to execute the Contract, are on file in the office of the City Clerk, which copies <br />shall be made available to any interested party on request. Contractor shall <br />post a copy of said prevailing rate of per diem wages at each job site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.