My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt97 Union Electric Construct
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1997
>
Agmt97 Union Electric Construct
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2005 10:16:03 AM
Creation date
9/29/2005 4:24:00 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Union Electric Construction
PROJECT NAME
city hall standby electrical generator
RMP File Number
304
Date
10/22/1997
Reso Ref
13116 13158 13211
Box
6042
Sticky Note
ID:
1
Text:
1 agreement
9 notice of completion
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ORIGINAL <br /> <br />DES:djk 09/22/97 <br />F:SharedlRedwood/Council/ Agmt-118 <br /> <br />AGREEMENT <br /> <br />THE CITY OF REDWOOD CITY, a municipal corporation in the State of California, <br />hereinafter referred to as "City", and UNION ELECTRICAL CONSTRUCTION, INC. of <br />Hayward, California, hereinafter referred to as "Contractor", for the consideration <br />hereinafter stated, hereby agree as follows: <br /> <br />1. Contractor shall perform everything required to be performed, shall provide and <br />furnish all of the labor, equipment, materials, and tools to perform, within <br />Sixty (60) calendar days after the NOTICE TO PROCEED, the following work: <br /> <br />CITY HALL STANDBY ELECTRICAL GENERATOR <br /> <br />in strict accordance with the Plans, Contract Documents and Specifications <br />pertaining thereto and signed by the City Engineer of Redwood City, which <br />Documents are incorporated herein and made a part of this Agreement as if <br />herein fully set forth. <br /> <br />2. City shall pay to Contractor, as full consideration for the faithful performance <br />by Contractor of the aforementioned work, the amount of One Hundred Six <br />Thousand One Hundred Sixty-three and No/100 Dollars ($106,163,00) <br />computed in accordance with Contractor's accepted Proposal dated <br />September 17, 1997, which accepted Proposal is incorporated herein by <br />reference thereto as if herein fully set forth, <br /> <br />3, All of the work to be done shall be done under the direction and supervision <br />of, and to the approval of, City or its authorized representative, and the work <br />shall be done in the best workmanlike manner, conforming strictly to the <br />provisions of the specifications and plans made thereof, <br /> <br />4. (a) Contractor shall comply with all applicable provisions of Section 1810 to <br />1815, inclusive, of the California labor Code relating to working hours. <br />Contractor shall, as a penalty to City, forfeit Twenty five and No/1 00 <br />Dollars ($25,00) for each worker employed in the execution of the Contract <br />by Contractor or by any subcontractor for each calendar day during which <br />such worker is required or permitted to work more than 8 hours in anyone <br />calendar day and 40 hours in anyone calendar week, unless such <br />worker receives compensation for all hours Worked in excess of eight (8) <br />hours at not less than 1-1/2 times the basic rate of pay, <br /> <br />(b) Pursuant to the provision of California labor Code, Sections 1770 et seq. <br />Contractor and any subcontractor under him shall pay not less than the <br />prevailing rate of per diem wages as determined by the Director of the <br />California Department of Industrial Relations. Pursuant to the provisions of <br />California labor Code Section 1773.2, Contractor is hereby advised that <br />copies of the prevailing rate of per diem wages and a general prevailing <br />rate for holidays, Saturdays and Sundays and overtime work in the locality <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.