Laserfiche WebLink
<br />ORIGI'NAL <br /> <br />APR 1 0 2006 <br /> <br />AGREEMENT <br />FOR THE <br />CITY OF REDWOOD CITY/REDEVELOPMENT AGENCY <br /> <br />THE REDWOOD CITY REDEVELOPMENT AGENCY, a charter Agency and municipal <br />corporation in the State of California (hereinafter referred to as "Agency") and ST. FRANCIS <br />ELECTRIC of San Leandro, California (hereinafter referred to as "Contractor") (collectively, the <br />"Parties"), for the consideration hereinafter stated, hereby agree as follows: <br /> <br />1. Contractor shall perform everything required to be performed, shall provide and furnish all <br />of the labor, equipment, materials, and tools to perform, within Thirty (30) calendar days <br />after the NOTICE TO PROCEED, the following work: <br /> <br />CITY PARKING LOT - BLOCK 2 FUTURE PARKING CONTROLS <br /> <br />in strict accordance with the Plans, Contract Documents and Specifications pertaining <br />thereto and signed by the Manager, Engineering and Construction of Redwood City, which <br />Documents are incorporated herein and made a part of this Agreement as if herein fully <br />set forth. <br /> <br />2. Agency shall pay to Contractor, as full consideration for the faithful performance by <br />Contractor of the aforementioned work, the amount of Twenty Two Thousand Six Hundred <br />and Noli 00 Dollars ($22,600.00) computed in accordance with Contractor's accepted <br />Proposal dated, March 30, 2006, which accepted Proposal is incorporated herein by <br />reference thereto as if herein fully set forth. <br /> <br />3. All of the work to be done shall be done under the direction and supervision of, and to the <br />approval of, Agency or its authorized representative, and the work shall be done in the <br />best workmanlike manner, conforming strictly to the provisions of the specifications and <br />plans made thereof. <br /> <br />4. (a) Contractor shall comply with all applicable provisions of Section 1810 to 1815, <br />inclusive, of the California Labor Code relating to working hours. Contractor shall, as a <br />penalty to Agency, forfeit Twenty five and Noli 00 Dollars ($25.00) for each worker <br />employed in the execution of the Contract by Contractor or by any subcontractor for each <br />calendar day during which such worker is required or permitted to work more than eight <br />(8) hours in anyone (1) calendar day and 40 hours in anyone (1) calendar week, unless <br />such worker receives compensation for all hours worked in excess of eight (8) hours at <br />not less than 1-112 times the basic rate of pay. <br /> <br />(b) Pursuant to the provision of California Labor Code, Sections 1770 et seq. Contractor <br />and any subcontractor under him shall pay not less than the prevailing rate of per diem <br />wages as determined by the Director of the California Department of Industrial Relations. <br />Pursuant to the provisions of California Labor Code Section 1773.2, Contractor is hereby <br />advised that copies of the prevailing rate of per diem wages and a general prevailing rate <br />for holidays, Saturdays and Sundays and overtime work in the locality in which the work is <br />to be performed for each craft, classification, or type of worker required to execute the <br />Contract, are on file in the office of the City Clerk, which copies shall be made available to <br />any interested party on request. Contractor shall post a copy of said prevailing rate of per <br />diem wages at each job site. <br /> <br />(c) As required by Section 1773.8 of the California Labor Code, Contractor shall pay travel <br />and subsistence payments to each worker needed to execute the work, as such travel and <br /> <br />Atty/Agr/2006.014 <br />040506 <br /> <br />S/library/agreements/award/City Parking Lot - Block 2 Future Parking Controls <br />