My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res85 9891
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
1980-1989
>
Res85 9891
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 1:43:04 PM
Creation date
10/11/2019 1:43:04 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
6/3/1985
Description
JUN 3 1985 RES 0 L UTI 0 N N O. 9891 RESOLUTION APPROVING AND AUTHORIZING EXECUTION OF AGREEMENTS BETWEEN THE CITY OF REDWOOD CITY AND PACIFIC GAS AND ELECTRIC COMPANY RELATING TO UNDERGROUNDING OF ELECTRICAL FACILITIES ALONG SEAPORT BOULEVARD IN ACCORDANCE WITH RULE 20B AND GRANTING P.G.& E. OWNERSHIP OF UNDERGROUND FACILITIES WHEN WORK IS COMPLETED COPY; \vHEREAS, the City of Redwood City requires replacement of existing overhead electrical facilities and to install conduit and structures and substructures for the required undergrounding of overhead power lines and inspection costs as part of Seaport Boulevard Reconstruction Project; and
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />DCB:sh <br />DCB: sh <br />DCB:sh <br /> <br />5/20/85 <br />5/30/85R <br />5/31/85R <br />JUN 3 1985 <br /> <br />RES 0 L UTI 0 N <br /> <br />N O. <br /> <br />9891 <br /> <br />RESOLUTION APPROVING AND AUTHORIZING EXECUTION OF <br />AGREEMENTS BETWEEN THE CITY OF REDWOOD CITY AND PACIFIC <br />GAS AND ELECTRIC COMPANY RELATING TO UNDERGROUNDING OF <br />ELECTRICAL FACILITIES ALONG SEAPORT BOULEVARD IN <br />ACCORDANCE WITH RULE 20B AND GRANTING P.G.& E. <br />OWNERSHIP OF UNDERGROUND FACILITIES WHEN WORK IS <br />COMPLETED <br /> <br />COPY; <br /> <br />\vHEREAS, the City of Redwood City requires replacement of <br /> <br />existing overhead electrical facilities and to install conduit <br /> <br />and structures and substructures for the required undergrounding <br /> <br />of overhead power lines and inspection costs as part of Seaport <br /> <br />Boulevard Reconstruction Project; and <br /> <br />WHEREAS, Pacific Gas and Electric Company will underground <br /> <br />said facilities provided Redwood City meets the conditions of <br /> <br />Rule 20B; and <br /> <br />WHEREAS, an agreement has been presented to this Council for <br /> <br />its approval by Pacific Gas and Electric Company to provide the <br /> <br />above-referenced services to City; and <br /> <br />WHEREAS, the City desires to grant P.G.& E. ownership of <br /> <br />underground electrical facilities when the work is completed; <br /> <br />NOW, THEREFORE; <br /> <br />BE IT RESOLVED BY THE COUNCIL OF THE CITY OF REDWOOD CITY, <br /> <br />AS FOLLOWS: <br /> <br />Those certain agreements by and between the City of Redwood <br /> <br />City and Pacific Gas and Electric Company entitled, "Pacific Gas <br /> <br />and Electric Company - Agreement to Install Facilities or Perform <br /> <br />Other Work", in which the City grants ownership of said <br /> <br />facilities to P.G.& E. when the work is completed and approves <br /> <br />such undergrounding project services attached hereto, are hereby <br /> <br />approved, and the City Manager is hereby authorized and directed <br /> <br />9891 <br />
The URL can be used to link to this page
Your browser does not support the video tag.