My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt20 Robert A. Bothman Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2020
>
Agmt20 Robert A. Bothman Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 11:10:37 AM
Creation date
2/4/2020 3:13:50 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Robert A. Bothman Construction, Inc.
PROJECT NAME
Magical Bridge Playground
RMP File Number
304
Date
1/17/2020
Reso Ref
15765
MO Ref
18-170
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF REDWOOD CITY, CALIFORNIA <br />PARKS, RECREATION AND COMMUNITY DEVELOPMENT DEPARTMENT <br />COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION <br />CHANGE ORDER NO: 7 <br />PURCHASE ORDER NO: 51118'1 <br />ACCT. NO: 358-80148 <br />Sheet: 1 of 1 Original Contract Amount: $5,553,436.00 <br />Date: 1/17/2020 Previous Change Orders: $954,658.28,- <br />Project: <br />954,658.28/Project: Magical Bridge Playground This Change Order: $24,514.63 <br />Contractor: Robert A. Bothman <br />Construction, Inc. <br />Accumulative Total: <br />$6,532,608.91 <br />You are hereby directed to make the herein described changes from the plans and specifications or do the following <br />described work not included in the plans and specifications of this contract. All new work herein described shall be done in <br />accordance with the applicable provisions of the plans and specifications, except as specifically modified by this contract <br />change order. NOTE: This change order is not effective until approved by the City. This change order includes all costs and <br />time required to complete the additional work described herein and the contractor shall be entitled to no other <br />compensation. <br />DESCRIPTION OF CHANGE <br />COST <br />Installation of boulders (Reason: During the re -bid of the project, several items were <br />designated as city furnished, contractor installed or were removed completely from the <br />original bid. The boulders are a necessary element to retain the wall for the slide mound <br />in the playground. The City sourced and procured the boulders but city staff was unable <br />to perform the installation. The boulder installation requires the contractor's machinery <br />due to the size and weight of the boulders.) $24,514.63 <br />TOTAL $24,514.63 <br />Due to inclement weather, an 0 day extension of time will be allowed. <br />Adjusted contract completion date �Nn1 1 <br />Submitted By: .� y u/ l Title: Project Manager Date: 1/17/19 <br />Approval Recommended: Title: <br />We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree. If this change <br />order is approved, we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all <br />services necessary for the work above specs ed, and will accept as full payment therefor the prices shown above. <br />Accepted by: I YVV V�A Title) <br />Contractor: t fC� �� Date 112, <br />City Approval: VI•J("Lra /11 war oyl, jdt G<. Date 1/.30/'2-0 <br />cplb)pw/coform.Master <br />Attest ��7 t -I <br />Pamela Aguilar, City Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.