My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 Peak Engineering
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Peak Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2011 9:43:05 AM
Creation date
8/18/2009 8:28:16 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Peak Engineering
PROJECT NAME
Sewer Force Main Replacement Project (from P.S. #12 to P.S. #10)
RMP File Number
304
Date
8/4/2009
MO Ref
09-138
Sticky Note
ID:
1
Text:
Faithful Performance Bond pages 5-7
Payment Bond pages 8-11
Indemnity Agreement with SureTec pages 12-14.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OR'IGINAL <br /> <br />AGREEMENT <br />for the <br />City of Redwood City <br /> <br />SEWER FORCE MAIN REPLACEMENT PROJECT <br />(FROM P.S. # 12 TO P.S. # 10) <br /> <br />~iM~ <br />THIS AGREEMENT, made this day of , 2009, by and between Peak <br />Engineering Inc. whose place of busin ss is at 4 7~ d Way, Oakland, CA 94621, <br />hereinafter called "CONTRACTOR", and the City of Redwood City, a Charter City and municipal <br />corporation of the State of California, hereinafter referred to as "CITY". <br /> <br />In consideration of the mutual covenants hereinafter set forth, Contractor and City agree <br />as follows: <br /> <br />I. WORK <br /> <br />A. Contractor shall complete all Work specified in the Contract documents, in <br />accordance with the Specifications, Drawings, and all other terms and conditions <br />of the Contract documents. <br /> <br />II. CONTRACT SUM <br /> <br />A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br />accordance with the Contract documents, as the amount of Four hundred fourteen <br />thousand six hundred thirty five and 11/100 Dollars ($414,635.11) computed in <br />accordance with Contractor's Accepted Proposal dated, June 3, 2009, which <br />Proposal is incorporated herein by reference thereto as if fully set forth. <br /> <br />B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br />taxes on materials and equipment, and labor furnished by Contractor, its <br />subcontractors, sub consultants, architects, engineers, and vendors or otherwise <br />arising out of Contractor's performance of the Work, including any increases in any <br />such taxes during the term of this Agreement; and any duties, fees, and royalties <br />imposed with respect to any materials and equipment, labor or services. The taxes <br />covered hereby include (but are not limited to) occupational, sales, use, excise, <br />unemployment, FICA, and income taxes, customs, duties, and any and all other <br />taxes on any item or service that is part of the Work, whether such taxes are <br />normally included in the price of such item or service or are normally stated <br />separately. Notwithstanding the foregoing, each party shall bear such state or local <br />inventory, real property, personal property or fixtures taxes as may be properly <br />assessed against it by applicable taxing authorities. <br /> <br />III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> <br />A. Contractor shall complete the Work within the following Schedule reflecting the date <br />the Contract Time commences to run as set forth in Section 00550 (Notice to <br />Proceed) and Section 00700 (General Conditions); and <br /> <br />1. Contractor shall achieve Final Completion of the Work within One hundred <br />twenty (120) Calendar Days from the date the Contract Time commences to <br />run. <br /> <br />AGREEMENT <br />SEWER FORCE MAIN REPLACEMENT PROJECT (FROM P.S. # 12 TO P.S. # 10) <br />
The URL can be used to link to this page
Your browser does not support the video tag.