My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 J & M, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 J & M, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2010 5:06:24 PM
Creation date
9/10/2009 1:26:15 PM
Metadata
Fields
Template:
Agreement
Contractor Name
J & M, Inc
PROJECT NAME
RWC nRecycled Water Ph-1 Bid Pkg 5A
RMP File Number
304
Date
9/1/2009
MO Ref
09-162, 10-046
Sticky Note
ID:
1
Text:
Faithful Performance Bond
pages 5-9
Payment Bond
pages 10-11
Conformed Receipt pages 14-16 #2010-028131 dated 03/12/2010
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ORIGINAL <br /> <br />AGREEMENT <br />for the <br />City of Redwood City <br /> <br />REDWOOD CITY RECYCLED WATER PROJECT - PHASE 1 <br />SEAPORT DISTRIBUTION SYSTEM <br />Bid Package SA (Herkner Road and Central Concrete Driveway) <br /> <br />THIS AGREEMENT, made this day of . , 2009, by and between J&M, <br />Inc., whose place of business is at 6700 National Drive, rmore, CA 94550 hereinafter called <br />"CONTRACTOR", and the City of Redwood City, a Charter City and municipal corporation of the <br />State of California, hereinafter referred to as "CITY". <br /> <br /> <br />In consideration of the mutual covenants hereinafter set forth, Contractor and City agree <br />as follows: <br /> <br />I. WORK <br /> <br />A. Contractor shall complete all Work specified in the Contract Sections, in <br />accordance with the Specifications, Drawings, and all other terms and conditions <br />of the Contract Sections. <br /> <br />II. CONTRACT SUM <br /> <br />A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br />accordance with the Contract Sections, as the amount of Two hundred thirty six <br />thousand four hundred seventy eight and 25/100 Dollars ($236,478.25), computed <br />in accordance with Contractor's Accepted Proposal dated July 8, 2009, which <br />Proposal is incorporated herein by reference thereto as if fully set forth. <br /> <br />B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br />taxes on materials and equipment, and labor furnished by Contractor, its <br />subcontractors, subconsultants, architects, engineers, and vendors or otherwise <br />arising out of Contractor's performance of the Work, including any increases in any <br />such taxes during the term of this Agreement; and any duties, fees, and royalties <br />imposed with respect to any materials and equipment, labor or services. The taxes <br />covered hereby include (but are not limited to) occupational, sales, use, excise, <br />unemployment, FICA, and income taxes, customs, duties, and any and all other <br />taxes on any item or service that is part of the Work, whether such taxes are <br />normally included in the price of such item or service or are normally stated <br />separately. Notwithstanding the foregoing, each party shall bear such state or local <br />inventory, real property, personal property or fixtures taxes as may be properly <br />assessed against it by applicable taxing authorities. <br /> <br />III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> <br />A. Contractor shall complete the Work within the following Schedule reflecting the date <br />the Contract Time commences to run as set forth in Section 00550 (Notice to <br />Proceed) and Section 00700 (General Conditions); and <br /> <br />1. Contractor shall achieve Substantial Completion of the Work within ninety (90) <br />Calendar Days from the date the Contract Time commences to run. <br /> <br />SEAPORT RECYCLED WATER DISTRIBUTION SYSTEM, BID PACKAGE SA <br />
The URL can be used to link to this page
Your browser does not support the video tag.