My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt22 Lewis and Tibbitts, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2022
>
Agmt22 Lewis and Tibbitts, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2022 10:32:13 AM
Creation date
4/22/2022 10:31:16 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Lewis and Tibbitts, Inc.
PROJECT NAME
Veterans Memorial Traffic Calming Project
RMP File Number
304
Date
1/22/2022
MO Ref
21-227
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORIGIN 0 <br />AGREEMENT <br />THIS AGREEMENT, dated this -7-41'�day of ��t�l `� _ 2022, by and between LEWIS <br />AND TIBBITTS, INC. whose place of business is located at 1470 Industrial Avenue, San Jose, CA 95112 <br />(Contractor), and CITY OF REDWOOD CITY, a California charter city and municipal corporation (City), <br />acting under and by virtue of the authority vested in City by the laws of the State of California. <br />WHEREAS, City, by its Minute Order No. 21-227 adopted on the 201h day of December, 2021 <br />awarded to Contractor the following Contract: <br />VETERANS MEMORIAL OFFSITE TRAFFIC CALMING — PACKAGE ONE <br />at <br />REDWOOD CITY, CA 94061 <br />NOW, THEREFORE, in consideration of the mutual covenants hereinafter set forth, Contractor and <br />City agree as follows: <br />ARTICLE 1 SCOPE OF WORK OF THE CONTRACT <br />1.01 WORK OF THE CONTRACT <br />A. Contractor shall complete all Work specified in the Contract Documents, in accordance with the <br />Specifications, Drawings, and all other terms and conditions of the Contract Documents (Work). <br />1.02 PRICE FOR COMPLETION OF THE WORK <br />A. City shall pay Contractor the following Contract Sum One Million Sixty Six Thousand Seventy <br />Six Dollars and No/100 ($1,066,076.00) for completion of Work in accordance with Contract <br />Documents as set forth in Contractor's Bid, attached hereto. <br />ARTICLE 2 COMMENCEMENT AND COMPLETION OF WORK <br />2.01 COMMENCEMENT OF WORK <br />A. Contractor shall commence Work on the date established in the Notice to Proceed <br />(Commencement Date). <br />B. City reserves the right to modify or alter the Commencement Date. <br />2.02 COMPLETION OF WORK <br />A. Contractor shall achieve Final Completion of the entire Work 90 Days from the Commencement <br />Date. <br />ARTICLE 3 PROJECT REPRESENTATIVES <br />3.01 CITY'S PROJECT MANAGER <br />A. In the pre -construction conference, referenced in item No. 5, Document 00 5100 (Notice of Award), <br />the City will designate as its Project Manager to act as City's Representative in all matters relating <br />to the Contract Documents. If Project Manager is an employee of City, Project Manager is the <br />beneficiary of all Contractor obligations to City including, without limitation, all releases and <br />indemnities. <br />B. Project Manager shall have final authority over all matters pertaining to the Contract Documents <br />and shall have sole authority to modify the Contract Documents on behalf of City, to accept work, <br />and to make decisions or actions binding on City, and shall have sole signature authority on behalf <br />of City. <br />ATTY/DOCS - AGREEMENT/CONSTRUCTION AGREEMENTS <br />REV: 09-09-2020 PR <br />VETERANS MEMORIAL OFFSITE TRAFFIC CALMING - PACKAGE ONE <br />
The URL can be used to link to this page
Your browser does not support the video tag.