My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 Redgwick Construction Company
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Redgwick Construction Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2009 9:39:06 AM
Creation date
10/27/2009 8:54:27 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Redgewick Construction
PROJECT NAME
El Camino Real Grand Boulevard Streetscaping
RMP File Number
304
Date
10/19/2009
Reso Ref
14967
MO Ref
09-198
Sticky Note
ID:
1
Text:
Faithful performance bond - pages 5-8
Payment bond pages 9-13
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ORIGINAL <br /> <br />AGREEMENT <br />for the <br />City of Redwood City <br /> <br />EL CAMINO REAL "GRAND BOULEVARD" STREETSCAPING PROJECT <br />(Broadway to Brewster Avenue) <br /> <br /> <br />THIS AGREEMENT, made this ~day OfG ~fijV ,2009, by and between <br />Redgwick Construction CO.,_whose place of business is at 8150 Enterprise Drive_Newark, CA <br />94560 hereinafter called "CONTRACTOR", and the City of Redwood City, a Charter City and <br />municipal corporation of the State of California, hereinafter referred to as "CITY". <br /> <br />In consideration of the mutual covenants hereinafter set forth, Contractor and City agree <br />as follows: <br /> <br />I. WORK <br /> <br />A. Contractor shall complete all Work specified in the Contract Documents, in <br />accordance with the Specifications, Drawings, and all other terms and conditions <br />of the Contract Documents. <br /> <br />II. CONTRACT SUM <br /> <br />A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br />accordance with the Contract Documents, as the amount of One million four <br />hundred thirteen thousand five hundred eighty two and 80/100 Dollars <br />($1,413,582.80) computed in accordance with Contractor's Accepted Proposal <br />dated, August 26, 2009 which Proposal is incorporated herein by reference thereto <br />as if fully set forth. <br /> <br />B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br />taxes on materials and equipment, and labor furnished by Contractor, its <br />subcontractors, subconsultants, architects, engineers, and vendors or otherwise <br />arising out of Contractor's performance of the Work, including any increases in any <br />such taxes during the term of this Agreement; and any duties, fees, and royalties <br />imposed with respect to any materials and equipment, labor or services. The taxes <br />covered hereby include (but are not limited to) occupational, sales, use, excise, <br />unemployment, FICA, and income taxes, customs, duties, and any and all other <br />taxes on any item or service that is part of the Work, whether such taxes are <br />normally included in the price of such item or service or are normally stated <br />separately. Notwithstanding the foregoing, each party shall bear such state or local <br />inventory, real property, personal property or fixtures taxes as may be properly <br />assessed against it by applicable taxing authorities. <br /> <br />III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> <br />A. Contractor shall complete the Work within the following Schedule reflecting the date <br />the Contract Time commences to run as set forth in Section 00550 (Notice to <br />Proceed) and Section 00700 (General Conditions); and <br />1. Contractor shall achieve Substantial Completion of the Work within One <br />Hundred Fifty (150) Calendar Days from the date the Contract Time <br /> <br />EI Camino Real"Grand Boulevard" Streetscaping Project (Broadway to Brewster Avenue) <br />
The URL can be used to link to this page
Your browser does not support the video tag.