My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 FieldTurf USA, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Agmt25 FieldTurf USA, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2025 11:53:48 AM
Creation date
6/16/2025 11:53:30 AM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Mitchell Fair Oaks Field Synthetic Turf Replacement Project
RMP File Number
304
Date
6/13/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORIGINAL, <br />AGREEMENT <br />THIS AGREEMENT, dated this 1?1 day of -�`'�� , 2025, by and between <br />FIELDTURF USA, INC. whose place of business is located at 7445 Cote-de-Liesse Suite 200, <br />Montreal, Quebec, H4T 1G2 (Contractor), and CITY OF REDWOOD CITY, a California <br />charter city and municipal corporation (City), acting under and by virtue of the authority vested in <br />City by the laws of the State of California. <br />WHEREAS, City, by its Item No. 6. J. adopted on the 19th day of May, 2025 awarded to <br />Contractor the following Contract: <br />MITCHELL & FAIR OAKS FIELD SYNTHETIC TURF REPLACEMENT PROJECT <br />at 1333 Madison Avenue, Redwood City, CA 94061; and, <br />609 Hampshire Ave, Redwood City, CA 94063 <br />NOW, THEREFORE, in consideration of the mutual covenants hereinafter set forth, <br />Contractor and City agree as follows: <br />ARTICLE 1 SCOPE OF WORK OF THE CONTRACT <br />1.01 WORK OF THE CONTRACT <br />A. Contractor shall complete all Work specified in the Contract Documents, in accordance <br />with the Specifications, Drawings, and all other terms and conditions of the Contract <br />Documents (Work). <br />1.02 PRICE FOR COMPLETION OF THE WORK <br />A. City shall pay Contractor the following Contract Sum Two Million One Hundred Ninety - <br />Eight Thousand Nine Hundred Ninety -Six Dollars and No/100 ($2,198,996.00) <br />(Contract Sum) for completion of Work in accordance with Contract Documents as set <br />forth in Contractor's Bid, attached hereto. <br />ARTICLE 2 COMMENCEMENT AND COMPLETION OF WORK <br />2.01 COMMENCEMENT OF WORK <br />A. Contractor shall commence Work on the date established in the Notice to Proceed <br />(Commencement Date). <br />B. City reserves the right to modify or alter the Commencement Date. <br />2.02 COMPLETION OF WORK <br />A. Contractor shall achieve Final Completion of the entire Work 90 Days from the <br />Commencement Date. <br />ARTICLE 3 PROJECT REPRESENTATIVES <br />3.01 CITY'S PROJECT MANAGER <br />A. In the pre -construction conference, referenced in item No. 5, Document 00 5100 (Notice <br />of Award), the City will designate as its Project Manager to act as City's Representative in <br />ATTY/DOCS -AGREEMENT/CONSTRUCTION AGREEMENT <br />REV: 01-21-2023 SK 005200-1 <br />AGREEMENT - MITCHELL & FAIR OAKS FIELD SYNTHETIC TURF REPLACEMENT PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.