Laserfiche WebLink
<br />Lower Lateral Replacement Project 2025 Form CONTRACT <br /> Page 1 <br />Contract <br /> <br />This public works contract (“Contract”) is entered into by and between the City of Redwood City (“City”) <br />and Casey Construction, Inc. (“Contractor”), a California corporation, for work on the City’s Lower Lateral <br />Replacement Project (“Project”), and is effective on __________, 2025 (“Effective Date”). <br /> <br />The parties agree as follows: <br /> <br />1. Scope of Work. Contractor will perform and provide all labor, materials, equipment, supplies, <br />transportation, and any and all other items or services necessary to perform and complete the work <br />required for the Project (“Work”), as specified in Exhibit A, Scope of Work, attached hereto and <br />incorporated herein, and according to the terms and conditions of this Contract and the Contract <br />Documents, as defined below. <br /> <br />1.2 Contract Documents. The following constitute the “Contract Documents” for the <br />Project: <br /> <br />(A) Change orders (if any) <br />(B) Addenda (if any) <br />(C) Contract and Exhibits thereto <br />(D) Payment and Performance Bonds (if the Contract is over $25,000) <br />(E) Notice to Proceed <br />(F) Notice of Award <br />(G) City’s Engineering Standards (available online at <br />https://www.redwoodcity.org/departments/community-development-and- <br />transportation/engineering-transportation/engineering/engineering-standards) <br />(H) Notice Inviting Bids <br />(I) Contractor’s Bid Proposal and attachments thereto <br /> <br />1.3 Order of Precedence. Any conflict or inconsistency among the Contract Documents, <br />following the order of precedence in which the documents are listed above, with <br />documents higher on the list taking precedence over documents lower on the list, and the <br />most recent version taking precedence over any earlier version. In the event of any <br />conflict or inconsistency between the Contract or any of the Exhibits thereto, the Contract <br />terms will control over any conflicting or inconsistent provisions in the Exhibits. <br /> <br />2. Contract Price. As full and complete compensation for Contractor’s timely performance and <br />completion of the Work in strict accordance with the terms and conditions of the Contract, City will <br />pay Contractor $88,010 for all of Contractor’s direct and indirect costs to perform the Work, <br />including all labor, materials, supplies, equipment, taxes, insurance, bonds and all overhead <br />costs, in accordance with the payment provisions contained herein (“Contract Price”). <br /> <br />2.1 Payment. Contractor must submit an invoice on the first day of each month during the <br />Contract Time, defined in Section 3 below, and/or upon completion, for the Work <br />performed during the preceding month, itemizing labor, materials, equipment and any <br />incidental costs incurred. Contractor warrants that title to all work, materials and <br />equipment incorporated into the Work will pass to City free of any claims, liens, or <br />encumbrances upon payment to Contractor. The City reserves the right to withhold <br />retention in the amount of five percent from any progress payment if the Project is not <br />completed within a 30-day period. Substitution of appropriate securities in lieu of retention <br />amounts from progress payments is permitted pursuant to Public Contract Code § 22300. <br /> <br />2.2 Payment and Performance Bonds. If the Contract Price is over $25,000, Contractor <br />must provide City with a payment bond and a performance bond using the bond forms <br />included in this Contract as Exhibit B, Bond Forms, and submit the bonds as specified <br />June 26