My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 United Storm Water, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Agmt25 United Storm Water, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 3:53:19 PM
Creation date
7/3/2025 3:53:18 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Document 00 5200 Agreement
RMP File Number
304
Date
6/23/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGREEMENT 00 5200-1 <br /> <br />DOCUMENT 00 5200 <br /> <br />AGREEMENT <br /> <br />THIS AGREEMENT, dated this ____ day of _____________, 2025, by and between <br />United Storm Water, Inc. whose place of business is located at 14000 E. Valley Blvd, City of <br />Industry, CA 91746 (Contractor), and CITY OF REDWOOD CITY, a California charter city and <br />municipal corporation (City), acting under and by virtue of the authority vested in City by the laws <br />of the State of California. <br /> <br />WHEREAS, on the 9th day of June 2025, City awarded to Contractor the following <br />Contract: <br /> <br />ASSESSMENT, FABRICATION, AND INSTALLATION OF CERTIFIED TRASH CAPTURE <br />DEVICES PROJECT <br />at <br />VARIOUS LOCATIONS WITHIN CITY OF REDWOOD CITY <br /> <br />NOW, THEREFORE, in consideration of the mutual covenants hereinafter set forth, <br />Contractor and City agree as follows: <br /> <br />ARTICLE 1 SCOPE OF WORK OF THE CONTRACT <br /> <br />1.01 WORK OF THE CONTRACT <br /> <br />A. Contractor shall complete all Work specified in the Contract Documents, in accordance <br />with the Specifications, Project Drawings, and all other terms and conditions of the <br />Contract Documents (Work). <br /> <br />1.02 PRICE FOR COMPLETION OF THE WORK <br /> <br />A. City shall pay Contractor the following Contract Sum ($280,209) for completion of Work in <br />accordance with Contract Documents as set forth in Contractor’s Bid. <br /> <br />AL = Allowance CF = Cubic Feet CY = Cubic Yard EA = Each LB = Pounds <br />LF = Linear Foot LS = Lump Sum SF = Square Feet TON = Ton (2000 lbs) <br /> <br /> <br />Item <br /> <br />Description <br />Estimated <br />Quantity Unit Unit Price Total Item Cost <br />1. Mobilization, demobilization, <br />traffic control, and other <br />incidentals <br /> <br />1 LS $25,473.00 $25,473.00 <br />2. Catch Basin Cleaning 183 EA $287.00 $52,521.00 <br />3. Field Assessment <br /> 183 EA $95.00 $17,385.00 <br />4. Manufacture and Installation of <br />Connector Pipe Screen 183 EA $1,010.00 $184,830.00 <br /> <br />Total <br /> <br />Total (Sum of Items 1-4) <br /> <br /> <br /> <br /> <br /> <br />Total Bid <br />Price <br /> <br />$280,209.00 <br />23rd June
The URL can be used to link to this page
Your browser does not support the video tag.