Red Morton Gym Flooring Project 2025 Form CONTRACT <br />Page 1 <br />Contract <br />This public works contract (“Contract”) is entered into by and between the City of Redwood City (“City”) <br />and HY Floor and Gameline Painting, Inc. (“Contractor”), a California corporation, for work on the City’s <br />Red Morton Gym Floor Re-striping Project (“Project”), and is effective on ______________, 2025 <br />(“Effective Date”). <br />The parties agree as follows: <br />1.Scope of Work. Contractor will perform and provide all labor, materials, equipment, supplies, <br />transportation, and any and all other items or services necessary to perform and complete the work <br />required for the Project (“Work”), as specified in Exhibit A, Scope of Work, attached hereto and <br />incorporated herein, and according to the terms and conditions of this Contract and the Contract <br />Documents, as defined below. <br />1.2 Contract Documents. The following constitute the “Contract Documents” for the Project: <br />(A)Change orders (if any) <br />(B)Addenda (if any) <br />(C)Contract and Exhibits thereto <br />(D)Payment and Performance Bonds (if the Contract is over $25,000) <br />(E)Notice to Proceed <br />(F)Notice of Award <br />(H)Notice Inviting Bids <br />(I)Contractor’s Bid Proposal and attachments thereto <br />1.3 Order of Precedence. Any conflict or inconsistency among the Contract Documents, <br />following the order of precedence in which the documents are listed above, with documents <br />higher on the list taking precedence over documents lower on the list, and the most recent <br />version taking precedence over any earlier version. In the event of any conflict or <br />inconsistency between the Contract or any of the Exhibits thereto, the Contract terms will <br />control over any conflicting or inconsistent provisions in the Exhibits. <br />2.Contract Price. As full and complete compensation for Contractor’s timely performance and <br />completion of the Work in strict accordance with the terms and conditions of the Contract, City will <br />pay Contractor $ 80,292 for all of Contractor’s direct and indirect costs to perform the Work, <br />including all labor, materials, supplies, equipment, taxes, insurance, bonds and all overhead costs, <br />in accordance with the payment provisions contained herein (“Contract Price”). <br />2.1 Payment. Contractor must submit an invoice on the first day of each month during the <br />Contract Time, defined in Section 3 below, and/or upon completion, for the Work performed <br />during the preceding month, itemizing labor, materials, equipment and any incidental costs <br />incurred. Contractor warrants that title to all work, materials and equipment incorporated <br />into the Work will pass to City free of any claims, liens, or encumbrances upon payment to <br />Contractor. The City reserves the right to withhold retention in the amount of five percent <br />from any progress payment if the Project is not completed within a 30-day period. <br />Substitution of appropriate securities in lieu of retention amounts from progress payments <br />is permitted pursuant to Public Contract Code § 22300. <br />2.2 Payment and Performance Bonds. If the Contract Price is over $25,000, Contractor must <br />provide City with a payment bond and a performance bond using the bond forms included <br />in this Contract as Exhibit B, Bond Forms, and submit the bonds as specified in the Notice <br />of Award. Each bond must be issued by a surety admitted in California. If an issuing surety <br />cancels a bond or becomes insolvent, Contractor must provide a substitute bond from a <br />surety acceptable to City within seven days after written notice from City. If Contractor fails <br />to substitute an acceptable surety within the specified time, City may, in its sole discretion <br />November 25