My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt09 Pavex Construction Division of San Jose
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2009
>
Agmt09 Pavex Construction Division of San Jose
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2010 11:44:22 AM
Creation date
1/11/2010 8:30:11 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Pavex Construction Divison of San Jose
PROJECT NAME
Redwood Shores Levee Improvement Project
RMP File Number
304
Date
12/23/2009
MO Ref
09-269
Sticky Note
ID:
1
Text:
Payment Bond pages 5-8
Faithful Performance Bond pages 9-12
Notice of Completition dated 12/14/2010 pgs 13-14.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ORIGINAL <br /> <br />AGREEMENT <br />for the <br />City of Redwood City <br /> <br />SAN CARLOS AIRPORT LEVEE IMPROVEMENT PROJECT <br /> <br />THIS AGREEMENT, made this 22- day of fJeLP,nPrf, 20J!j, by and between <br />Granite Rock Company DBA Pavex Construction Division whose place of business is at 120 <br />Granite Rock Way, San Jose, CA 95136, hereinafter called "CONTRACTOR", and the City of <br />Redwood City, a Charter City and municipal corporation of the State of California, hereinafter <br />referred to as "CITY". <br /> <br />In consideration of the mutual covenants hereinafter set forth, Contractor and City agree <br />as follows: <br /> <br />I. WORK <br /> <br />A. Contractor shall complete all Work specified in the Contract documents, in <br />accordance with the Specifications, Drawings, and all other terms and conditions <br />of the Contract documents. <br /> <br />II. CONTRACT SUM <br /> <br />A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br />accordance with the Contract documents, as the amount of Four hundred one <br />thousand six hundred forty nine Dollars ($401,649.00) computed in accordance <br />with Contractor's Accepted Proposal dated, December 2, 2009 which Proposal is <br />incorporated herein by reference thereto as if fully set forth. <br /> <br />B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br />taxes on materials and equipment, and labor furnished by Contractor, its <br />subcontractors, subconsultants, architects, engineers, and vendors or otherwise <br />arising out of Contractor's performance of the Work, including any increases in any <br />such taxes during the term of this Agreement; and any duties, fees, and royalties <br />imposed with respect to any materials and equipment, labor or services. The taxes <br />covered hereby include (but are not limited to) occupational, sales, use, excise, <br />unemployment, FICA, and income taxes, customs, duties, and any and all other <br />taxes on any item or service that is part of the Work, whether such taxes are <br />normally included in the price of such item or service or are normally stated <br />separately. Notwithstanding the foregoing, each party shall bear such state or local <br />inventory, real property, personal property or fixtures taxes as may be properly <br />assessed against it by applicable taxing authorities. <br /> <br />III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> <br />A. Contractor shall complete the Work within the following Schedule reflecting the date <br />the Contract Time commences to run as set forth in Section 00550 (Notice to <br />Proceed) and Section 00700 (General Conditions); and <br /> <br />1. Contractor shall achieve Substantial Completion of the Work before January <br />31,2010. No work is allowed after January 31,2010. <br /> <br />AGREEMENT 00520-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.