Laserfiche WebLink
<br />RES 0 L UTI 0 N <br /> <br />N 2.. 212S <br /> <br />---------- <br /> <br />DECLARING~ IN ACCORDANCE 'WITH THE PROVISIONS OF' CHAPTER 90 PART 7 <br />CHAPTER 1 OF ARTICLE 2, SECTIONS 1770 to 1781, OF CALIPORNIA STATUES <br />AS ENACTED BY THE STATE LEGILATURE AT ITS' 52ND SESSION (1937) AND <br />AS SUBSEQUENTLY AI1ENDED, THE GEW~RAL PREVAILING RATE OF PER HOUR <br />WAGES AND THE GENERAL PREVAILING RATE FOR LEGAL HOLIDAYS AND OVER- <br />TIME WORK FOR CERTAIN CRAFTS OR TYPE OF wORI~mN IN THE CITY OF <br />REDWOOD CITY, AND IN AND UPON ALL LANDS Ov.Il'fED BY AND UNDER THE <br />~JRISDICTION OF SAID CITY, AND REPEALING CO}WLICTING RESOLUTIONS. <br /> <br />RESOLVED by the City Council of the City of Redwood City <br />that the general prevailing rate of per hour wages in the City of <br />Redwood Ci ty, Cal if ornia, and in and upon all lands o'Wne d by, and un- <br />der the jurisdiction of, said City for certain crafts or type of <br />workmen needed to execute public works contracts with said City, <br />and the general prevailing rate for legal holidays and overtime <br />work which said specified rates the Contractor or any subcontractor <br />under him must pay in accordance with the provisions and require- <br />ments of Chapter 90 of the C~ifornia Statutes as enacted by the <br />State Legislature at its 52nd session and as subsequently amended <br />are hereby ascertained and'declared as follows: <br /> <br />RATE per HOUR <br /> <br />CRAFT <br /> <br />Asbestos vforker <br />Bricklayer (7 hours) <br />Bricklayer Hodcarrier <br />Carpenter <br />Hardwood Floor Layer <br />Shinglers <br />Carpet, Linolemn & Soft Tile Layers <br />Cement Mason <br />Electrical Worker <br />Engineers: <br />APprentices(oilers, firemen, signalmen,watchmen) <br />Asphalt Plant Engineer <br />Boom truck or dual purpose A-frrone truck <br />Box men or mixer box operator(concrete/asphalt) <br />Brakemen, Switchmen and Deckhand <br />Fuller-Kenyon pump cement hog & similar equip. <br />Combination mixer & compressor op.'gunite work <br />Compressor Operator <br />Compressors (more than one) <br />Concrete Batch Plant Operator <br />Concrete Batch Plant Op.(Multiple unit,4 or <br />Concrete Mixers (up to one yard) <br />Concrete Mixers (over one yard) <br />Concrete Pmnp or Pump Crete Guns <br />Concrete Saw Operator (self-propelled unit, on <br />streets, highways, airports and canals) <br />Deck Engineer <br />Derrick Barges (except excavation work) <br />Derricks (including Chicago Booms) <br />Drilling Machinery Engineers (not to apply to <br />water liners, wagon drills or jackhammers) <br />(Apprentice required) <br />Dual Drum }1ixer (Apprentice engineer required) <br />Euclid Loaders and/or similar type of equipment <br />(Apprentice engineer reqLlired) <br />Fireman in Hot Plant <br />Fork Lift or lunlber stacker (on construction <br />job site <br />Handi-crane (no oiler re~uired) <br />Heavy Duty Repairman and/or v~elders on work <br />covered by this Agreement <br />Heavy Duth Repairman, Helper <br />Heavy Duty Rotary Drill Rigs (such as quarry <br />master, etc.)(self contained units) <br />(Apprentice engineer required) <br /> <br />$ 3.275 <br />3.75 <br />2.90 <br />3.125 <br />3.25 <br />3.25 <br />26.75 per <br />2.995 <br />3.375 <br /> <br />day <br /> <br />2.705 <br />3.095 <br />3.095 <br />2.765 <br />2.705 <br />3 .145 <br />3.325 <br />2.705 <br />3.035 <br />3..095 <br />more) 3.255 <br />2.705 <br />3.035 <br />3.035 <br /> <br />3.095 <br />3.095 <br />3.325 <br />3.255 <br /> <br />3.095 <br />3 .145 <br />3 · 425 <br />2.705 <br />2.985 <br />3 .145 <br />3.095 <br />2.705 <br /> <br />3.325 <br />