My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt10 Robert A. Bothman, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2010
>
Agmt10 Robert A. Bothman, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2010 10:50:59 AM
Creation date
4/30/2010 2:21:28 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Robert A. Bothman, Inc.
PROJECT NAME
Hawes Park Renovation
RMP File Number
304
Date
4/28/2010
MO Ref
10-056
Sticky Note
ID:
1
Text:
Escrow Agreement for Security Deposits in lieu of Retention pgs 19-21.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I '. <br /> <br />1lRIGINAL <br /> <br />AGREEMENT <br />for the <br />City of Redwood City <br /> <br />HAWES PARK RENOVATION <br /> <br />~ c-: <br />THIS AGREEMENT, made thi day of . . G, 2010, by and <br />between Robert A. Bothman, Inc. who I c of business i at 650 Quinn Avenue, San Jose, <br />CA 95t...12 hereinafter called "CONTRACTOR", and the City Redwood City, a Charter City and <br />municipal corporation of the State of California, hereinafter referred to as "CITY". <br /> <br />In consideration of the mutual covenants hereinafter set forth, Contractor and City agree <br />as follows: <br /> <br />I. WORK <br /> <br />A. Contractor shall complete all Work specified in the Contract documents, in <br />accordance with the Specifications, Drawings, and all other terms and conditions <br />of the Contract documents. <br /> <br />II. CONTRACT SUM <br /> <br />A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br />accordance with the Contract documents, as the amount of One million four <br />hundred twenty one thousand one hundred twenty eight and 00/100 Dollars <br />($1,421,128.00), computed in accordance with Contractor's Accepted Proposal <br />dated, February 10, 2010, which Proposal is incorporated herein by reference <br />thereto as if fully set forth. <br /> <br />B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br />taxes on materials and equipment, and labor furnished by Contractor, its <br />subcontractors, subconsultants, architects, engineers, and vendors or otherwise <br />arising out of Contractor's performance of the Work, including any increases in any <br />such taxes during the term of this Agreement; and any duties, fees, and royalties <br />imposed with respect to any materials and equipment, labor or services. The taxes <br />covered hereby include (but are not limited to) occupational, sales, use, excise, <br />unemployment, FICA, and income taxes, customs, duties, and any and all other <br />taxes on any item or service that is part of the Work, whether such taxes are <br />normally included in the price of such item or service or are normally stated <br />separately. Notwithstanding the foregoing, each party shall bear such state or local <br />inventory, real property, personal property or fixtures taxes as may be properly <br />assessed against it by applicable taxing authorities. <br /> <br />III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> <br />A. Contractor shall complete the Work within the following Schedule reflecting the date <br />the Contract Time commences to run as set forth in Section 00550 (Notice to <br />Proceed) and Section 00700 (General Conditions); and <br /> <br />1. Contractor shall achieve Substantial Completion of the Work within 120 <br />Calendar Days from the date the Contract Time commences to run. <br /> <br />AGREEMENT 00520-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.