Laserfiche WebLink
• 411, <br /> T : c. 050 <br /> y?. <br /> U JI I T 0 C; <br /> P E72ROTIV,',FAT <br /> POPLAR, VIRGINIA AND JUNIPERO AVENUES <br /> .:.; r. Lv ' • - <br /> .• <br /> ■,; r: • •• <br /> , . <br /> ; - <br /> . , . <br /> , <br /> c, S r..170 CT; <br /> (a) The irnprovernent of Poplar Ave- <br /> nue by constructirrg and installing <br /> therein 2" asphaltic concrete paving <br /> with 6" Crusher run rock Vase 31 in <br /> -,. width, standard conefete Curbs, gut <br /> ters and width concrete sidewalks <br /> on both sides thereof; . for its entire <br /> length om its intersection with the <br /> Westerly . line of that tract of land in <br /> Redwood City known as Portola Ad- <br /> dition to its interseetiori'wtth JuniPerd <br /> Avenue: <br /> (b) The improvement of / Virginia <br /> Avenue the Sartre as for replier' Ave- <br /> nue in (a) above from its intersec- <br /> tion with Poplar Avenue to its in- <br /> tersection with -Redwood Avenue. <br /> (c) The improverne.nt of Junipero <br /> Avenue the same as for Poplar A,ve- <br /> nue in (a.) above from its inter:a:160On <br /> with 'Poplar Avenue to its interseic <br /> tion With Redwood Avenue, frovided <br /> however that the complete terisec- <br /> tirni of Jiinipert) Avenue and treed <br /> Avenue Shall be irrintoved with as- <br /> phaltic Coocrete paving and concrete <br /> curbs, gutters and standard concrete <br /> sidewalks shall be constructed at the <br /> northerly corners of said, intersection. <br /> , (d) The construction and installa- <br /> tion of two (2) 15" reinforced concrete <br /> tpe ' siphons across Virginia Avenue <br /> Its iinte.rsection with Poplar Ave- <br /> u. connected with a standard ,Con-. <br /> Catch bainn to be constrtieted <br /> end of saitt'alphons; the don <br /> Str Ction- and installation of a 15" <br /> . reinforced eOnerete pipe ,(Itorm, drain <br /> across the of Poplar' and <br /> •unipero Avenues connected with a <br /> ft.M... <br /> an.. Crete catch' basin to be <br /> ,congtructe at each end of said storm . <br /> drain; the construction and installs- <br /> , /ton of a 15" reiiifOr4d pi <br /> karat drain connected with the afore- <br /> mentioned catch basin to , be construct- <br /> . ed on the Easterly side of Xanigero <br /> Avenue at its interieetion with rop- <br /> ier Avenue, extending aaphattitattaiy <br /> SP in an easterly direction ,frOM" said <br /> catch bap In a 5' ease atOng• <br /> and <br /> coup :lot ems tO the t rly <br /> tilock 3, PO got Addition <br /> ed' to a 46! metal <br /> co lve 1.matOy_. *nth to <br /> , •Died in sad ' <br /> otattruall. . rain. <br /> faro - concrete - ; 1444+ = Oros* <br /> Jaatiieto-Avetitla - • •. •. :Avenue <br /> Corxnetterl With a Nt.; , err" , tiOnMwt, s <br /> Catch basin to be ecinstrUbted at either <br /> end thereof. - • - <br /> (f) The constrtietion and in,stallit- <br /> Woo of all necessary ..aPptirtilitentea to <br /> , complete the Work, dederibed in (a) to <br /> (e), Inclusive. <br /> „„, <br />