Laserfiche WebLink
AGREEMENT JJR Construction <br /> <br />THE CITY OF REDWOOD CITY, a charter city and municipal corporation in the State of <br />California (hereinafter referred to as "City") and J. J. R. CONSTRUCTION, INC, of San Mateo, <br />California (hereinafter referred to as "Contractor") (collectively, the "Parties"), for the <br />consideration hereinafter stated, hereby agree as follows: <br /> <br /> 1. Contractor shall perform everything raquirad to be performed, shall provide and furnish all <br /> of the labor, equipment, materials, and tools to perform, within Sixty (60) calendar days <br /> after the NOTICE TO PROCEED, the following work: <br /> <br /> WELLESLEY CRESCENT LANDSCAPE/TRAFFIC IMPROVEMENTS <br /> <br /> in strict accordance with the Plans, Contract Documents and Specifications pertaining <br /> thereto and signed by the Manager, Engineering and Construction of Redwood City, which <br /> Documents are incorporated herein and made a part of this Agreement as if herein fully <br /> set forth. <br /> <br /> 2. City shall pay to Contractor, as full consideration for the faithful performance by Contractor <br /> of the aforementioned work, the amount of One Hundred Twenty Four Thousand Nine <br /> Hundred Forty Five and No/100 Dollars ($124,945.00) computed in accordance with <br /> Contractor's accepted Proposal dated, June 18, 2003, which accepted Proposal is <br /> incorporated herein by reference thereto as if herein fully set forth. <br /> <br /> 3. All of the work to be done shall be done under the direction and supervision of, and to the <br /> approval of, City or its authorized representative, and the work shall be done in the best <br /> workmanlike manner, conforming strictly to the provisions of the specifications and plans <br /> made thereof. <br /> <br /> 4. (a) Contractor shall comply with all applicable previsions of Section 1810 to 1815, <br /> inclusive, of the California Labor Code relating to working hours. Contractor shall, as a <br /> penalty to City, forfeit Twenty five and No/100 Dollars ($25.00) for each worker employed <br /> in the execution of the Contract by Contractor or by any subcontractor for each calendar <br /> day during which such worker is required or permitted to work more than eight (8) hours <br /> in any one (1) calendar day and 40 hours in any one (1) calendar week, unless such <br /> worker receives compensation for all hours worked in excess of eight (8) hours at not less <br /> than 1-1/2 times the basic rate of pay. <br /> <br /> (b) Pursuant to the provision of California Labor Code, Sections 1770 et seq. <br /> Contractor and any subcontractor under him shall pay not less than the prevailing rate of <br /> per diem wages as determined by the Director of the California Department of Industrial <br /> Relations. Pursuant to the provisions of California Labor Code Section 1773.2, Contractor <br /> is hereby advised that copies of the prevailing rate of per diem wages and a general <br /> prevailing rate for holidays, Saturdays and Sundays and overtime work in the locality in <br /> which the work is to be performed for each craft, classification, or type of worker required <br /> to execute the Contract, are on file in the office of the City Clerk, which copies shall be <br /> made available to any interested party on request. Contractor shall post a copy of said <br /> prevailing rate of per diem wages at each job site. <br /> <br /> (c) As required by Section 1773.8 of the California Labor Code, Contractor shall pay <br /> travel and subsistence payments to each worker needed to execute the work, as such <br /> <br />F:Atty/Ag r/Agr.133 <br />062403 -1- <br /> <br /> <br />