My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt12 PG&E Pacific Gas and Electric
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2012
>
Agmt12 PG&E Pacific Gas and Electric
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2012 8:11:46 AM
Creation date
7/5/2012 8:10:23 AM
Metadata
Fields
Template:
Agreement
Contractor Name
PG&E Pacific Gas and Electric
PROJECT NAME
Middlefield Rd Redwood City R20A Tariff scheduled related work
RMP File Number
804
Date
6/18/2012
MO Ref
12-095
Sticky Note
ID:
1
Text:
See supplemental Agreement Pg 3.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� = �UPI1�'AT� <br /> � ORIG�NAi. <br /> Pacific Gas and Electric Company <br /> � � <br /> Agreement to Pertorm PROJECT MGR. Donna Pontrello, <br /> Tariff Scheduled Related Work, Liaison <br /> Rule 20A General Conditions PM# <br /> PROJECT NAME: MIDDLEFIELD RD REDWOOD CITY R20A <br /> LOCATION: REDWOOD CITY,CALIFORNIA <br /> City: Redwood City <br /> City/County of Redwood City, (Applicant) has requested PACIFIC GAS AND ELECTRIC COMPANY, a California <br /> � corporation(PG&E)to perform the tariff scheduled related work as located and described herein. <br /> General Conditions: <br /> PG&E will,at its expense, replace its existing overhead electric facilities with underground electric facilities as outlined in the <br /> � Rule 20 Tariff. To ensure the success of this program,the Applicant agrees to support the Rule 20A Program as follows: <br /> Responsibilities of the Apalicant: <br /> 1. Consult with PG&E to confirm the requirements and location of the project. <br /> 2. Provide a resolution and boundary map as required in Electric Rule 20. <br /> 3. Provide a list of all recorded property owners,APN#, phone number and address. <br /> 4. Provide a list of the most recent tenant(for rental properties). <br /> 5. Provide Base Map(in AutoCAD)showing the following:boundary, roads,future road improvements,sidewalks, curbs, <br /> property lines,buildings,existing water and sewer,easements,and any other known utilities or obstacles. <br /> 6. Secure all required rights-of-way and easements,which must be satisfactory to and approved by PG&E. <br /> 7. Own and manage all contaminated soils. (Rule 20A funding cannot be used for environmental remediation costs) <br /> 8. Own and manage all cultural resource findings. (Rule 20A funding cannot be used for managing cultural resource <br /> findings). <br /> � 9. Provide recent pot holing/core samplings and soils/paving information from projects that were recently completed. <br /> 10. Provide acceptable construction yard for materials and equipment storage. <br /> 11. Pay for paving and restoration costs beyond the standard excavations and restorations necessary for the construction <br /> of the project. Joint trench participants will replace paving, landscaping,sidewalk,etc.that is removed during <br /> construction. (Rule 20A funding cannot be used for additional restoration costs). <br /> 12. Waive paving moratorium requirements,or pay for additional costs above PG&E's responsibility for restoration. <br /> 13. Stake and survey for any associated future grade changes. <br /> 14. Should applicant require additional traffic control beyond that which PG&E provides(per California Joint Utility Traffic <br /> Control Committee),Applicant will pay for the additional costs. <br /> 15. Should Applicant require a traffic control plan,Applicant will prepare or pay to prepare such a plan. <br /> 16. Pay for streetlight costs per Street Light Agreement. <br /> 17. Remove Applicant owned streetlights attached to utility poles and located within the underground district at Applicant <br /> cost. . <br /> 18. Issue and waive cost of encroachment permit. <br /> 19. Waive work hour restrictions for construction, including holiday and/or special construction limitations. <br /> 20. Waive all permit fees and other incidental project specific costs,including but not limited to:parking charges; rental <br /> cost of city or county properties;and lost revenues. <br /> Responsibilities of PG8�E: <br /> 1. Provide consultation to Applicant to establish resolution and boundary map. <br /> 2. If designated as the design/trench lead,prepare the Intents,Composite and Form B(costs will be shared by all joint <br /> trench participants). <br /> 3. Provide electric design to the design/trench lead agency,if lead is other than PG&E. <br /> 4. Identify all locations that require an easement. <br /> 5. Prepare easement documents for signature. <br /> 6. Upon request of the Applicant, Rule 20A allocation may be used for the installation of no more than 100 feet of each <br /> customer's underground electric service lateral. <br /> 7. Upon request of the Applicant,the Rule 20A allocation may be used for the conversion of electric service panels to <br /> accept underground service, up to$1,500 per service entrance(excluding permit fees). Alternatively,if the Applicant <br /> requests that PG&E manage the panel conversion work, pertorm such conversions by agreement(Form 79-1113, <br /> Agreement to Perform Tariff Schedule Related Work, Rule 20A). <br /> � <br /> I 1 Form 79-1127(Rev 12/10) <br /> Service Planning <br /> Advice No.XXXX-E <br />
The URL can be used to link to this page
Your browser does not support the video tag.