Laserfiche WebLink
- R,I�TURN TO: 2013-1 s1452 <br /> City Clerk 4:31 pm 11l22I13 NC Fee:NO FEE <br /> Redwood City Hall Count of Pages 2 <br /> Recorded in Official Records <br /> P.O. Box 391 County of San Mateo <br /> RedWOOd Clty, CA 94064 Mark Church <br /> Assessor-Count Clerk-Recorder <br /> Per Government Code Section 6103 I II I II III,IIII IIIII I II I�I IIII IIIII IIIII IIII I <br /> II I IIII <br /> No recordation fee required. * R o 0 0 � 7 � 4 9 1 0 * <br /> NOTICE OF COMPLETION <br /> (Public Work) <br /> NOTICE IS HEREBY GIVEN: That the public work hereinafter described was <br /> completed in the City of Redwood City and accepted by the City Council on November 18, 2013 <br /> and that the public work above referred to is the following: <br /> Sanitary Sewer Pump Station 10 Improvements Project <br /> That the name and address of the owner of the aforesaid public work is the City of <br /> Redwood City, a municipal corporation of the State of California, P.O. Box 391, City Hall, <br /> Redwood City, California; <br /> That the nature of the interest or estate of the City of Redwood City in fee and to the <br /> real property upon which the aforesaid public work is removing a portion of the existing motor <br /> control cabinet, install two variable frequency drives and remote telemetry unit, installation of <br /> two level transducers and painting of existing motor control cabinet and generator enclosures. <br /> That the real property upon which the aforesaid public work is constructed and to which <br /> this notice of completion pertains is described as follows: <br /> Davit Lane and Barnegat Lane in Redwood City <br /> That the name of the original contractor for the aforesaid public work is: <br /> Blocka Construction, Inc. <br /> 4455 Enterprise Street <br /> Fremont, CA 94538 <br /> � <br /> ROBERT B. BELL � <br /> City Manager <br /> City of Redwood City <br /> E T• <br /> � <br /> SI VIA D LI EN <br /> City Clerk <br /> City of Redwood City <br />