My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 American Pavement Systems, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 American Pavement Systems, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 11:03:07 AM
Creation date
7/19/2016 10:53:06 AM
Metadata
Fields
Template:
Agreement
Contractor Name
American Pavement Systems, inc.
PROJECT NAME
2015-2016 Ashphalt Rubber Seal and Spot Repai Project
RMP File Number
304
Date
7/18/2016
MO Ref
16-122
Sticky Note
ID:
1
Text:
Payment Bond pages 9-13.
Faithful Performance Bond pages 14-16.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�� n � <br /> r.v��d4`dL ,.... <br /> , <br /> ,� . <br /> � ` AGREEMENT <br /> for the <br /> City of Redwood City <br /> 2015-2016 ASPHALT RUBBER CAPE SEAL AND SPOT REPAIR PROJECT <br /> THIS AGREEMENT, made this�day of 2016, by and between <br /> American Pavement Systems, Inc. wh e place of bu n ss i 1012 11�' Street, Suite 1000, <br /> Modesto, CA 95354 hereinafter called "CONTRACTOR", nd th City of Redwood City, a Charter <br /> City and municipal corporation of the State of Califomia, herein fter referred to as"CITY". <br /> In consideration of the mutual covenants hereinafter s forth, Contractor and City agree as <br /> follows: <br /> I. WORK <br /> A. Contractor shall complete all Work specified in the Contract documents, in <br /> accordance with the Specifications, Drawings, and all other terms and conditions of <br /> the Contract documents. <br /> II. CONTRACT SUM <br /> A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br /> accordance with the Contract documents, as the amount of Three Million One <br /> Hundred Seventy Seven Eight Hundred Ninety Two and 75/100 Dollars <br /> ($3,177,892.75) computed in accordance with Contractor's Accepted Bid J�eqesal <br /> dated, June 27, 2016 which Bid Ffe�esal is incorporated herein by reference thereto <br /> as if fully set forth. <br /> B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br /> taxes on materials and equipment, and labor furnished by Contractor, its <br /> subcontractors, subconsultants, architects, engineers, and vendors or otherwise <br /> arising out of Contractor's performance of the Work, including any increases in any <br /> such taxes during the term of this Agreement; and any duties, fees, and royalties <br /> imposed with respect to any materials and equipment, labor or services. The taxes <br /> covered hereby include (but are not limited to) occupational, sales, use, excise, <br /> unemployment, FICA, and income taxes, customs, duties, and any and all other taxes <br /> on any item or service that is part of the Work, whether such taxes are normally <br /> included in the price of such item or service or are normally stated separately. <br /> Nofinrithstanding the foregoing, each party shall bear such state or local inventory, real <br /> property, personal property or fixtures taxes as may be properly assessed against it <br /> by applicable taxing authorities. <br /> III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> A. Contractor shall complete the Work within the following Schedule reflecting the date <br /> the Contract Time commences to run as set forth in Section 00550 (Notice to <br /> Proceed) and Section 00700 (General Conditions); and <br /> 1. Contractor shall achieve Substantial Completion of the Work within thirty-five <br /> (35) Calendar Days from the date the Contract Time commences to run. <br /> B. Liauidated Damaaes <br /> AGREEMENT <br /> 2015-2016 ASPHALT RUBBER CAPE SEAL AND SPOT REPAIR PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.