My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 AA Construction
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 AA Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2007 2:08:15 PM
Creation date
5/26/2005 9:09:37 AM
Metadata
Fields
Template:
Agreement
Contractor Name
AA Construction
PROJECT NAME
Fire Station No. 9 -kitchenette renovation 3rd floor
RMP File Number
304
Date
3/3/2004
MO Ref
04-22 04-108
Box
6360
Sticky Note
ID:
1
Text:
1 Agreement
8 bonds
15 Notice of Completion
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OllIe INA¿ <br /> <br />AGREEMENT <br /> <br />THE CITY OF REDWOOD CITY, a charter city and municipal corporation in the St?te of <br />California (hereinafter referred to as "City") and A & A CONSTRUCTION CO., of l_OS <br />Gatos, California (hereinafter referred to as "Contractor") (collectively, the "Parties"), .'or <br />the consideration hereinafter stated, hereby agree as follows: <br /> <br />1. Contractor shall perform everything required to be performed, shall provide and <br />furnish all of the labor, equipment, materials, and tools to perform, within Thirty <br />(30) calendar days after the NOTICE TO PROCEED, the following work: <br /> <br />FIRE STATION #9 - 3RD FLOOR KITCHENETTE RENOVATION PROJECT <br /> <br />in strict accordance with the Plans, Contract Documents and Specifications <br />pertaining thereto and signed by the Manager, Engineering and Construction of <br />Redwood City, which Documents are incorporated herein and made a part of this <br />Agreement as if herein fully set forth. <br /> <br />2. City shall pay to Contractor, as full consideration for the faithful performance by <br />Contractor of the aforementioned work, the amount of Fifteen Thousand and <br />No/100 ($15,000.00) computed in accordance with Contractor's accepted Proposal <br />dated, October 28, 2003, which accepted Proposal is incorporated herein by <br />reference thereto as if herein fully set forth. <br /> <br />3. All of the work to be done shall be done under the direction and supervision of, and <br />to the approval of, City or its authorized representative, and the work shall be done <br />in the best workmanlike manner, conforming strictly to the provisions of the <br />specifications and plans made thereof. <br /> <br />4. (a) Contractor shall comply with all applicable provisions of Section 1810 to <br />1815, inclusive, of the California Labor Code relating to working hours. Contractor <br />shall, as a penalty to City, forfeit Twenty five and No/100 Dollars ($25.00) for each <br />worker employed in the execution of the Contract by Contractor or by any <br />subcontractor for each calendar day during which such worker is required or <br />permitted to work more than eight (8) hours in anyone (1) calendar day and 40 <br />hours in anyone (1) calendar week, unless such worker receives compensation for <br />all hours worked in excess of eight (8) hours at not less than 1-1/2 times the basic <br />rate of pay. <br /> <br />(b) Pursuant to the provision of California Labor Code, Sections 1770 et seq. <br />Contractor and any subcontractor under him shall pay not less than the prevailing <br />rate of per diem wages as determined by the Director of the California Department <br />of Industrial Relations. Pursuant to the provisions of California Labor Code Section <br />1773.2, Contractor is hereby advised that copies of the prevailing rate of per diem <br />wages and a general prevailing rate for holidays, Saturdays and Sundays and <br />overtime work in the locality in which the work is to be performed for each craft, <br />classification, or type of worker required to execute the Contract, are on file in the <br />office of the City Clerk, which copies shall be made available to any interested <br />party on request. Contractor shall post a copy of said prevailing rate of per diem <br />wages at each job site. <br /> <br />Atty/Agr/Agr.166 <br />012004 <br /> <br />r <br /> <br />... r"'-'-- T <br />
The URL can be used to link to this page
Your browser does not support the video tag.