My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt19 Anderson Pacific Engineering Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2019
>
Agmt19 Anderson Pacific Engineering Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 12:36:07 PM
Creation date
5/29/2019 12:20:50 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Anderson Pacific Engineering Construction, Inc.
PROJECT NAME
CA water tank, pump station and transmission main project
RMP File Number
304
Date
5/23/2019
MO Ref
19-069
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ORIGINAL AGREEMENT <br />forthe <br />City of Redwood City <br />CALIFORNIA WATER TANK, PUMP STATION AND TRANSMISSION MAIN PROJECT <br />THIS AGREEMENT, made this 23P day of 2019, by and between <br />Anderson Pacific Engineering Construction, Inc. w6ose of business is at <br />1390 Norman Avenue, Santa Clara, CA 95054 hereinafter called "CONTRACTOR", and the City of <br />Redwood City, a Charter City and municipal corporation of the State of California, hereinafter <br />referred to as "CITY". <br />In consideration of the mutual covenants hereinafter set forth, Contractor and City agree as <br />follows: <br />WORK <br />A. Contractor shall complete all Work specified in the Contract documents, in <br />accordance with the Specifications, Drawings, and all other terms and conditions of <br />the Contract documents. <br />II. CONTRACT SUM <br />A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br />accordance with the Contract documents, as the amount of Ten Million Five Hundred <br />Twelve Thousand One Hundred Sixty and No/100 Dollars <br />($10,512,160.00) computed in accordance with Contractor's Accepted Proposal Bid <br />dated March 6, 2019, which Pfepesal Bid is incorporated herein by reference thereto <br />as if fully set forth. <br />B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br />taxes on materials and equipment, and labor furnished by Contractor, its <br />subcontractors, subconsultants, architects, engineers, and vendors or otherwise <br />arising out of Contractor's performance of the Work, including any increases in any <br />such taxes during the term of this Agreement; and any duties, fees, and royalties <br />imposed with respect to any materials and equipment, labor or services. The taxes <br />covered hereby include (but are not limited to) occupational, sales, use, excise, <br />unemployment, FICA, and income taxes, customs, duties, and any and all other taxes <br />on any item or service that is part of the Work, whether such taxes are normally <br />included in the price of such item or service or are normally stated separately. <br />Notwithstanding the foregoing, each party shall bear such state or local inventory, real <br />property, personal property or fixtures taxes as may be properly assessed against it <br />by applicable taxing authorities. <br />III. CONTRACT TIME AND LIQUIDATED DAMAGES <br />A. Contractor shall complete the Work within the following Schedule reflecting the date <br />the Contract Time commences to run as set forth in Section 00550 (Notice to <br />Proceed) and Section 00700 (General Conditions); and <br />Contractor shall achieve Substantial Completion of the Work within the calendar <br />days specified for each Bid Schedule from the date the Contract Time <br />commences to run. The schedules shall be additive and based on the Bid <br />Schedule(s) awarded by the City: <br />AGREEMENT <br />CALIFORNIA WATER TANK, PUMP STATION & TRANSMISSION MAIN PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.